Transportation
The preliminary design of Zhejiang Taizhou City Railway Line S2 was approved
Seetao 2022-12-19 17:41
  • Taizhou City Railway Line S2 has a total of 20 stations, with a total investment of 30.734 billion yuan
  • The city D-type vehicle with the maximum running speed of 140 km/h and AC power supply is adopted, and the train operation control mode is CBTC
Reading this article requires
5 Minute

Recently, the preliminary design of Zhejiang Taizhou City Railway Line S2 was approved by Zhejiang Provincial Development and Reform Commission, laying an important foundation for accelerating the commencement of the project.

Overview of Taizhou City Railway Line S2

Taizhou City Railway Line S2 starts from Beiyang Town, Huangyan District, passes through Linhai City, Jiaojiang District, Taizhou Bay New Area, and finally ends at Taizhou Bay New Area Fangte Park. There are 20 stations along the line, including Beiyang Station, Toutuo Station, Qianyang Station, Xinqian Station, Jiangkou Station, Inner Ring Road Station, Jiaojiang No. 8 Middle School Station, Haihong Avenue Station, Lvmai South Road Station, Binhai Cluster Area Station, UAV Town Station and Fangte Station, 12 of which are elevated stations, Huangyan Station, Juxiang Avenue Station, Taizhou Station, Taizhou College Station, Citizen Square Station, Donghuan Avenue Station and Jidong Road Station, 7 of which are underground stations, and one of which is Taizhou West Station. The total investment of the project is 30.734 billion yuan.

The construction of Taizhou City Railway Line S2 is conducive to accelerating the construction of the Yangtze River Delta on the track, building a multi-level rail transit network, promoting the connection between east and west clusters in Taizhou City, guiding the rational layout of urban space, optimizing the urban travel structure, and improving the comprehensive transportation system.

After the completion of Taizhou City Railway Line S2, transfer with Ningbo Taizhou Wenzhou Railway and Jintai Railway at Taizhou West Railway Station, and transfer with Hangzhou Taizhou High speed Railway and City Railway Line S1 at Taizhou Station; The Taizhou Railway Station and Taizhou West Railway Station are effectively connected in series to achieve multi network integration of integrated transport hub; We will promote the coordinated development of the three core clusters of Huangyan, Jiaojiang and Taizhou Bay New Area.

Main technical standards

Urban D-type vehicles with the maximum running speed of 140 km/h and AC power supply are adopted, and the train operation control mode is CBTC. The train formation in the initial stage, near term and long term is 4, 4 and 6 respectively. Editor/Zhao E


Comment

Related articles

Transportation

ENERGY CHINA Guangxi Engineering Bureau upgrades two major highways in China and Kenya

03-27

Transportation

The Bakht Ayagoz railway in Kazakhstan is expected to be completed by 2027

03-27

Transportation

One rail connecting the two sides! Wuhan can directly reach Taiwan

03-27

Transportation

CRRC Brazil rail transit project receives 5.6 billion Brazilian reals financing and lands

03-26

Transportation

Gansu Linha and Longhai Capacity Expansion Project is about to start

03-26

Transportation

The world's first railway crossing, accelerating the construction of the Huangbai Railway

03-26

Collect
Comment
Share

Retrieve password

Get verification code
Sure