Macro
Inner Mongolia 2.9GW wind-solar hydrogen production integration project
Seetao 2022-12-26 15:08
  • Phase II of Green Hydrogen Chemical Demonstration Project in Wushen Banner, Ordos City
  • Wulanchabu 100,000-ton annual wind-solar hydrogen production integration demonstration project new energy construction scale 2.546 million kilowatts
Reading this article requires
6 Minute

China's renewable energy construction is sprinting towards the end of the year. On December 23, 2022, the Inner Mongolia Energy Bureau issued the "About the Implementation of the Second Phase of the Green Hydrogen Chemical Demonstration Project in Wushen Banner, Ordos City and the Integration of 100,000 tons of Wind and Solar Hydrogen Production in Wulanchabu" "Notice of Demonstration Projects", the People's Government of the Autonomous Region agrees that Sinopec Xinxing Inner Mongolia Green Hydrogen New Energy Company will implement the second phase of the green hydrogen chemical demonstration project in Wushen Banner, Ordos City, and the 100,000-ton annual wind-solar hydrogen production integration demonstration project in Wulanchabu .

According to the notice, the main construction content of the project is the second phase of the green hydrogen chemical demonstration project in Wushen Banner, Ordos City. Grid-connected type, new energy construction scale of 400,000 kilowatts (all of which are wind power), hydrogen production capacity of 20,000 tons/year, hydrogen used for Zhongtian Hechuang olefin green hydrogen replacement, and hydrogen storage capacity of 216,000 tons, project investment owner It is Sinopec Nova Inner Mongolia Green Hydrogen New Energy Company, with a planned total investment of 3 billion yuan. The start time is June 2023 and the production time is June 2024.

Wulanchabu 100,000-ton annual wind-solar hydrogen production integrated demonstration project. Grid-connected type, new energy construction scale of 2.546 million kilowatts (including 1.742 million kilowatts of wind power and 804,000 kilowatts of photovoltaic power), hydrogen production capacity of 100,000 tons per year, hydrogen is sent to Yanshan Petrochemical through long-distance pipelines, and the project investment owner is Sinopec Nova Inner Mongolia Green hydrogen new energy company, with a planned total investment of 20.5 billion yuan, will start construction in December 2023 and start production in June 2027.

According to the requirements, the wind and solar projects built in the demonstration projects are market-oriented grid-connected projects, and the electricity purchased by the power grid company shall not exceed 20% of the total new energy generation capacity of the project. Wind and solar projects and hydrogen production projects need to be put into operation at the same time. It is strictly forbidden to only build wind and solar projects, and hydrogen production projects are not put into operation. Grid-connected demonstration projects that have not been fully completed shall not be connected to the grid. Editor/Xu Shengpeng


Comment

Related articles

Macro

Global Trade and Investment Summit advocates open cooperation and AI enabled development

05-22

Macro

Abu Dhabi's New Policies Reshape the Dividend of Chinese Enterprises Going Global

05-22

Macro

The cumulative transmission capacity of Qingyu DC exceeds 100 billion kilowatt hours

05-22

Macro

China's port freight surged by 121%

05-22

Macro

Green electricity on Tarim Desert Highway breaks 15 million kWh

05-21

Macro

China's inland hydrogen ships achieve zero breakthrough

05-21

Collect
Comment
Share

Retrieve password

Get verification code
Sure