Special
Another key project in Central China started
Seetao 2022-12-30 09:16
  • Kailan Road has a total length of 26.292km and a red line width of 60m
  • Kailan Road Rapid Transformation and Upgrading Project was awarded by China Power Construction Road and Bridge Group Co., Ltd. with a total investment of about 2.855 billion yuan
Reading this article requires
10 Minute

Kaifeng has been occupying the Central Plains since ancient times. It is a place of great wealth and outstanding people. Lankao is a red hot land with glorious revolutionary tradition and rich revolutionary spirit. Based on the past, this land is rich in people and culture. With a view to the future, the upgrading of the road is not only the top-level design, but also the only way to be based on reality, when starting a new journey of building a socialist modern country in an all-round way and moving towards the second century goal. The construction of Kailan Road rapid transformation and upgrading project is of great significance for activating regional economic forces and promoting high-quality economic development. After the completion of the project, it can better promote the process of urbanization, promote various exchanges between urban and rural areas and between regions, drive the development of logistics, transportation and tourism, break the closed development model of backward areas, and accelerate the pace of getting rich in backward areas.

On December 29, 2022, the commencement ceremony of the reconstruction and expansion project of the section from Kailan Road (National Highway 240) to the downtown of Lankao County was held. The Third Hydropower Engineering Bureau, as a participating unit, participated in the activity at the venue. The commencement of this project marks an important step forward in the process of "Zheng Kailan's urbanization", which will greatly promote the economic and social development of the region.

At the commencement ceremony, Wang Yantao, Secretary of Xiangfu District Party Committee, introduced the project, and Chen Weizhong, Member of the Standing Committee of Kaifeng Municipal Party Committee, Executive Vice Mayor and Secretary of Lankao County Party Committee, announced the commencement of the project. Qian Zhongbao, Vice Mayor of Kaifeng City, Zhang Hongjun, Chief of Xiangfu District, Ding Xiangdong, Chief of Lankao County, principals of relevant construction units in Kaifeng City, Zhou Xiaowu, Secretary of the Party Committee and Chairman of the Board of Directors of China Power Construction Road and Bridge Group Co., Ltd., Zeng Chaobin, Member of the Party Committee and Deputy General Manager of the Third Hydropower Bureau, Zhang Tiefei, General Manager of Huazhong Company, Xue Feng, Secretary of the Party Committee, Dai Jun, General Manager of the Second Engineering Company, Zhang Hongjun, Deputy General Manager and other relevant leaders attended the event. More than 200 people participated, including representatives of relevant units and participating units in Kaifeng.

Project introduction

Kailan Road has a total length of 26.292 km and a red line width of 60 meters. It adopts a two-way eight lane first-class highway and a functional standard for urban roads; The total length of the connecting line between Kailan Road and G240 in Lankao County is 3.992 km, the subgrade width is 33.5 m, and the standard of two-way six lane first-class highway is adopted. The total investment of the project is about 2.855 billion yuan, and it is planned to be completed and open to traffic by the end of 2024. Kailan Road Rapid Reconstruction and Improvement Project was awarded by China Power Construction Road and Bridge Group Co., Ltd., and the second company of Sinohydro Bureau 3 Co., Ltd. acted as the performance subject of the second bid section. This project is of special significance in terms of the company's highway project performance and qualification, and contributes more to the social development of the third bureau.

Location Map of Kailan Road

Effect Picture of Kailan Road Advance (Lankao County Section)

Effect Picture of Kailan Road Advance (Xiangfu Section)

In recent years, Huazhong Company, the Henan based organization of Sinohydro Bureau 3 Co., Ltd., has carried out project cooperation with more than ten cities in Henan Province, including Zhengzhou, Kaifeng, Nanyang, Anyang, Jiyuan, Xuchang, etc., based on the management concept of opening up the market, strengthening performance, overcoming difficulties, making concerted efforts, and promoting development, The project performance ability has been fully affirmed and recognized by the local government. No time to wait, no future. Sinohydro Bureau 3 Co., Ltd. will, with the tenacity of rolling stones up the mountain and climbing over the ridge, work hard to meet the difficulties, continue to carry forward the spirit of being able to bear hardships and fight, and strive to build the Kailan Road rapid transformation and upgrading project into a high-quality demonstration project! Editor/Zhao E


Comment

Related articles

Special

In the "construction" spring, 3×660MW "item" jumped

04-23

Special

Launching Ceremony of the Secretariat of the China Central Asia Mechanism

04-01

Special

Xinjiang plans to build a 10 billion yuan automotive industry park project

03-18

Special

African women pursue their dreams of happiness with help of Chinese enterprises

03-07

Special

A New Chapter in Co Syria Cooperation between CCCC and Sierra Leone

03-04

Special

China and Hungary join hands to deepen Belt and Road cooperation

02-29

Collect
Comment
Share

Retrieve password

Get verification code
Sure