Construction Frontline
CRBC wins bid for Ecuador water pipeline project
Seetao 2023-01-04 09:30
  • The contract period of the Ecuador water pipeline project is 42 months
  • After completion, it will further improve the level of the capital's water supply infrastructure
Reading this article requires
4 Minute

Recently, the contract award ceremony for the Buenpo-Calderon Water Pipeline Project in Quito, Ecuador was grandly held in Calderon District, Quito.

Ecuador water pipeline project

Quito Mayor Santiago Valderas, General Manager of Quito Public Drinking Water and Sanitation Corporation Otto Zeballos, project financiers Inter-American Development Bank and Spanish Cooperation Agency, representatives of China Road and Bridge Ecuador Branch and Local residents attended the event.

Valderas

Zewayos

Zewayos said in his speech that the implementation of the project will completely change the current difficult water supply situation in the Calderón area and effectively meet the water needs of 500,000 residents in the area. He expressed his gratitude to the Inter-American Development Bank and other relevant financing institutions for their support, and hoped that the contractors would be honest, trustworthy and perform their contracts with high quality.

The main project content of the Buenpo-Calderón water pipeline project in Quito is the procurement and laying of 25.9 kilometers of seamless steel pipes for water supply, and the supporting construction of two suspension bridges and 12 drainage ponds. The contract period is 42 months. As a key project under the drinking water and drainage planning of Quito, it will greatly improve the water supply infrastructure of the capital of Ecuador after completion, and at the same time provide more stable drinking water services for the ever-increasing urban population. Editor/He Yuting

Comment

Related articles

Construction Frontline

The Gulei Zhongsha Ethylene Project in Fujian Province will be put into operation

04-29

Construction Frontline

Chinese shield tunneling supports water conservancy in Africa

04-29

Construction Frontline

Bangladesh's first railway electrification

04-28

Construction Frontline

China's Ruilin wins a large gold mine deal in Kyrgyzstan

04-28

Construction Frontline

Junxin Environmental Protection is building an incineration plant in Harbin

04-28

Construction Frontline

The 4-B section of the Luanda Ring Expressway has officially started construction

04-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure