Wind power
Longyuan Power won the Alxa scenic hydrogen production project
Seetao 2023-01-10 10:04
  • The planned construction capacity of the project is 600 MW, including 400 MW of wind power and 200 MW of photovoltaic power
  • After the completion of the project, it is estimated that the total annual power generation will reach 1.542 billion kWh, and 45600 tons of standard coal will be saved annually
Reading this article requires
3 Minute

On January 5, 2023, Longyuan Power Inner Mongolia Co., Ltd. announced that it had won the development index of the demonstration project of the 600MW scenic hydrogen and ammonia infrastructure integrated low-carbon park in the Alxa High-tech Zone. It is reported that this is the first green electricity hydrogen production project of the National Energy Group in Inner Mongolia during the "14th Five-Year Plan" period.

The project is located in Alxa Left Banner, Alxa League, Inner Mongolia Autonomous Region, with a planned construction capacity of 600 MW, including 400 MW of wind power and 200 MW of photovoltaic power.

After the completion of the project, the equivalent utilization hours of wind power will be 2980 hours, and the equivalent utilization hours of photovoltaic power will be 1750 hours. It is estimated that the total annual power generation will reach 1.542 billion kilowatt-hours, saving 45600 tons of standard coal and reducing 88300 tons of carbon dioxide emissions each year; The green electricity can be used to produce hydrogen and synthesize 140000 tons of ammonia every year. Compared with the conventional ammonia production method, it can save 154000 tons of standard coal and reduce 321.6 million tons of carbon dioxide emissions every year. Editor/Zhao E


Comment

Related articles

Wind power

880 million! Ejina 250000 kW wind power project starts construction

09-02

Wind power

Yunda Invests 3.074b Yuan in Cangnan Offshore Wind Power for Green Development

08-29

Wind power

Successful Power-On of Guidongpulo Wind Farm Booster Station

08-29

Wind power

Slovakia Tightens Wind Policy, Halts Domestic Projects

08-28

Wind power

Ruoqiang million kilowatt wind power starts construction

08-27

Wind power

Jiangsu Taicang Port Completes Shipment of All Egypt Suez Gulf Wind Power Equipment

08-25

Collect
Comment
Share

Retrieve password

Get verification code
Sure