Special
State Grid will build five new pumped storage power stations
Seetao 2023-01-12 10:06
  • In 2023, the State Grid will invest more than 520 billion yuan in construction and provide more than 40000 jobs
  • The State Grid has provided power services to more than 1.1 billion people, covering 26 provinces and municipalities in China
Reading this article requires
2 Minute

Xin Baoan, Chairman and Secretary of the Party Leadership Group of the State Grid Corporation of China: At present, the installed capacity of new energy connected to the grid by the State Grid Corporation of China has exceeded 670 million kilowatts, and the utilization rate has remained above 97%. At present, the capacity and installed capacity of new energy connected to the grid are the first in the world. Therefore, it is very important to accelerate the development and consumption of new energy.

In 2023, we plan to start the construction of five more pumped storage power stations and put them into operation. At that time, the installed capacity of the pumped storage power stations operated by the State Grid Corporation of China will reach 38 million kilowatts, 1.6 times the total installed capacity of the Three Gorges.Editor/Ma Xue

Comment

Related articles

Special

In the "construction" spring, 3×660MW "item" jumped

04-23

Special

Launching Ceremony of the Secretariat of the China Central Asia Mechanism

04-01

Special

Xinjiang plans to build a 10 billion yuan automotive industry park project

03-18

Special

African women pursue their dreams of happiness with help of Chinese enterprises

03-07

Special

A New Chapter in Co Syria Cooperation between CCCC and Sierra Leone

03-04

Special

China and Hungary join hands to deepen Belt and Road cooperation

02-29

Collect
Comment
Share

Retrieve password

Get verification code
Sure