Transportation
Langzhuo Expressway Reconstruction Project Survey and Design Bidding
Seetao 2023-01-17 08:43
  • The total length of the project is 57.579Km, and the total investment of the project is 9.588 billion yuan
  • The project is designed according to the expressway standard in the plain area, with a roadbed width of 42m and a design speed of 120km/h
Reading this article requires
6 Minute

On January 16, 2023, the Hebei Provincial Department of Transportation issued a tender announcement for the preliminary design of the reconstruction and expansion project of the Langzhuo Expressway Section of the G95 Ring Expressway in the Capital Area. billion.

Project Overview

The reconstruction and expansion project of Langzhuo Expressway has been included in the "14th Five-Year Plan for Highway Development in Hebei Province". It is a key expressway project in Hebei Province. Improving road traffic capacity is of great significance. The starting point of the project is located at the Langfang West Interchange, the starting point is K237+107, crosses the Tiantang River and Yongding River to the west, passes through the Gu’an East Interchange, passes through the Beijing-Xiong Intercity High-speed Railway, and then reaches Lihewu, then passes through the Beijing-Kowloon Railway and National Highway 106 Afterwards, continue westward to cross Daguang Expressway and Mangniu River via Shilipu, intersect with Jingxiong Expressway, pass through Dongwan Interchange, cross Baigou River to Liuhe Yingnan, and then go west via Jingbai Highway, Beijing-Hong Kong-Macao Expressway, Linjia Expressway Tun, after getting on Cross-country Highway 107 and Beijing-Guangzhou Railway, it ends at the bridge head on the west side of the separation interchange of Jingguang Railway. Designed according to the expressway standard in the plain area, the roadbed is 42m wide, and it is a fully enclosed two-way eight-lane expressway with a design speed of 120km/h.

There are 3 large bridges to be rebuilt and extended along the whole line, with a total length of 13,458 meters, and 6 large bridges, with a total length of 1,886 meters. There are 8 middle bridges with a total length of 485 meters; 23 small bridges with a total length of 436 meters; 8 culverts, 24 passages, 11 interchanges and 31 separate interchanges. The housing construction project includes 7 toll stations and 2 service areas. There are 2 connection lines, namely, the Gaoguanzhuang Interchange Connection Line is 5.72km long, and the Gu'an East Interchange Connection Line is 7.03km long. Keywords: engineering news, engineering construction information, engineering construction

Obtaining tender documents

Anyone who intends to participate in the bidding, please log in to the Hebei Provincial Public Resources Trading Service Platform to download the electronic bidding documents from 9:00 on January 16, 2023 to 17:00 on January 20, 2023. The deadline for submission of bid documents is 9:30:00 on February 7, 2023. Editor / Zhao E


Comment

Related articles

Transportation

Jiangsu Huaguoshan Avenue Renovation Project Starts

03-29

Transportation

Shudao Group signs contract for the Tunisian Besse Bridge project

03-29

Transportation

Changtai Yangtze River Bridge enters the sprint stage of full bridge closure

03-28

Transportation

The number of freight trains on the Lancang Mekong Express has exceeded 1000

03-28

Transportation

The construction of the high-speed railway will be completed in 24 years

03-28

Transportation

Lanzhou Air Control Infrastructure Project Starts

03-27

Collect
Comment
Share

Retrieve password

Get verification code
Sure