Hydrogen energy
Exxon New Energy Battery Industrial Park Project settled in Dali, Yunnan
Seetao 2023-02-03 15:27
  • Exxon New Energy mainly focuses on application scenarios such as energy storage and construction machinery
  • The product produced by the project is a large cylindrical battery cell with full tab lithium iron phosphate
Reading this article requires
6 Minute

Recently, a reporter from Seedao.com learned that the Dali Exxon New Energy Xiangyun Battery Industrial Park project officially started in Dali, Yunnan.

At the ceremony, Mr. You Jun, co-founder and president of Shenzhen Exxon New Energy delivered a speech, introducing the basic situation and product construction plan of Dali Exxon New Energy Xiangyun Project. He expressed the hope that the implementation of the Dali Exxon New Energy Xiangyun Battery Industrial Park project can further promote the closed-loop construction of the new energy ecological circle industrial chain in Dali Prefecture, and better implement the provincial party committee and government's proposal to accelerate the promotion of photovoltaic and new energy in Dali. The industrial positioning of the advanced manufacturing industry based on batteries strongly supports the revitalization and development of the advanced manufacturing industry in Dali Prefecture.

Basic information of the project

The Dali Exxon New Energy Xiangyun Battery Industrial Park Project has an estimated total investment of 8.5 billion yuan and covers an area of about 515 acres. 

It is planned to build 18GWh battery cell plants and supporting facilities in two phases. The first phase of the project is planned to start construction in February 2023 and is expected to be completed and put into operation before the end of the year; the second phase of the project is planned to start construction in August 2023 and is expected to be put into operation in the third quarter of 2024. After the two phases of the project are completed and put into production, it is expected that the annual output value will not be less than 10 billion yuan, and the annual tax contribution will not be less than 300 million yuan.

Product Construction Planning

Dali Exxon New Energy Xiangyun Battery Industrial Park mainly plans to produce all-tab lithium iron phosphate large cylindrical batteries, which have the advantages of high safety, good consistency, flexible grouping, and high production efficiency. Leading products The adaptability and cost economy have been highly recognized by the distributed energy storage market at home and abroad.

At the same time, Exxon New Energy Xiangyun Battery Industrial Park will actively respond to the national dual-carbon strategic goal, and build a zero-carbon factory in accordance with the internationally certified excellence standard. And improve energy management level and energy utilization efficiency, reduce greenhouse gas and pollutant emissions, reduce the risk of environmental accidents, and achieve full life cycle carbon emission management.Editor/Ma Xue

Comment

Related articles

Hydrogen energy

An investment of 3.6 billion yuan! Inner Mongolia green hydrogen project started

04-21

Hydrogen energy

Twenty billion dollars! Another country's green hydrogen industry has exploded

04-19

Hydrogen energy

The Sinopec hydrogen energy equipment manufacturing base was inaugurated

04-17

Hydrogen energy

The total amount is 1.7 billion yuan! Xinjiang Hami to build a hydrogen city

04-12

Hydrogen energy

Zhanjiang Steel zero carbon high-grade sheet steel plant project started

04-12

Hydrogen energy

2.5GW! Parry hydrogen cell manufacturing project started

04-10

Collect
Comment
Share

Retrieve password

Get verification code
Sure