Infrastructure
Take you to visit China's largest onshore crude oil processing station
Seetao 2023-02-08 14:42
  • At present, the station's water system, oil system and crude oil stabilization system have all reached a stable operating state
  • The No. 81 joint processing station of the Second Oil Production Plant of Xinjiang Oilfield Company has great strategic significance for ensuring national energy security
Reading this article requires
2 Minute

The current energy security environment is becoming more and more complex. Walking into the largest crude oil processing station in China's onshore oilfields - the No. 81 combined processing station of Xinjiang Oilfield Oil Production Plant No. Employees in various positions are busy in an orderly manner in the station area.

The No. 81 joint processing station of the Second Oil Production Plant is located about 7 kilometers east of Baijiantan District (Karamay High-tech Zone) in Karamay City. It is a key project of Xinjiang Oilfield Company.

The station was put into operation on December 27, 2021, realizing the start of construction and production in the same year. The designed crude oil processing capacity is 3 million tons per year, the scale of the produced water treatment system is 20,000 cubic meters per day, and the scale of the crude oil stabilization system is 3.3 million tons /Year. Editor/Xu Shengpeng


Comment

Related articles

International

New Industrial Revolution City Network of BRICS Countries Launched

06-01

Transportation

China and Kazakhstan will cancel transportation quotas by the end of 2026

05-31

International

The largest sulfuric acid plant in Central Asia has been put into operation in Kazakhstan

05-31

International

JP Morgan invests $3 billion to increase shipbuilding investment

05-31

International

Zambia-China JV Revives 95-Year Lime & Cement Plant

05-30

New infrastructure

AI computing power supports peak summer season

05-29

Collect
Comment
Share

Retrieve password

Get verification code
Sure