On February 17, 2023, the Zhejiang Provincial Public Resources Transaction Supervision Network released the public announcement of the candidates for the bidding of the Ningbo-Jinhua section of the Shaoxing section of the Ningbo-Jinhua Expressway Reconstruction and Expansion Project. The cost is 7.711 billion yuan, and the local leading enterprise won the bid.

Project Overview
Ningbo-Jinhua section Shaoxing section project of Ningbo-Jinhua section reconstruction and expansion project: the starting point is located near the junction of Ningbo Fenghua and Shaoxing Xinchang, the starting point pile number is K42+250, it is routed from east to west, and the Chenggongling Tunnel is set up through Shaxi Town in Xinchang to Shengzhou Jin Ting Town, Jinghuangze Town, Jingkai District, Sanjiang Street, Lushan Street, Ganlin Town, the end point is located in Baifengling Tunnel, Changle Town, and the end point is K115+650.

According to the functional positioning of the project and the demand analysis of the traffic capacity and the number of lanes, it is determined that the main line of the project adopts the two-way 8-lane expressway standard, the design speed is 100km/h, the partial road section with Ningbo is maintained at 80km/h, and the roadbed width is 41m. The connection line adopts the two-way four-lane first-class road standard, the design speed is 60km/h, and the width of the roadbed is 23m. Keywords: engineering news, engineering construction information, engineering construction

Winning bid information
Candidate for winning the bid for this project: Zhejiang Shanghai-Hangzhou-Ningbo Expressway Co., Ltd. is a consortium formed with Shaoxing Transportation Investment Group Co., Ltd. Congratulations to the winning bidder! Editor / Zhao E
Comment
Write something~