Transportation
Yongjin Expressway Reconstruction and Expansion Project Announced
Seetao 2023-02-20 08:46
  • The estimated total investment of this project is 13.711 billion yuan, and the construction and installation cost is 7.711 billion yuan
  • Ningbo-Jinhua Expressway Reconstruction and Expansion Project The total length of the Shaoxing section project from Ningbo to Jinhua is about 73.4km
Reading this article requires
4 Minute

On February 17, 2023, the Zhejiang Provincial Public Resources Transaction Supervision Network released the public announcement of the candidates for the bidding of the Ningbo-Jinhua section of the Shaoxing section of the Ningbo-Jinhua Expressway Reconstruction and Expansion Project. The cost is 7.711 billion yuan, and the local leading enterprise won the bid.

Project Overview

Ningbo-Jinhua section Shaoxing section project of Ningbo-Jinhua section reconstruction and expansion project: the starting point is located near the junction of Ningbo Fenghua and Shaoxing Xinchang, the starting point pile number is K42+250, it is routed from east to west, and the Chenggongling Tunnel is set up through Shaxi Town in Xinchang to Shengzhou Jin Ting Town, Jinghuangze Town, Jingkai District, Sanjiang Street, Lushan Street, Ganlin Town, the end point is located in Baifengling Tunnel, Changle Town, and the end point is K115+650.

According to the functional positioning of the project and the demand analysis of the traffic capacity and the number of lanes, it is determined that the main line of the project adopts the two-way 8-lane expressway standard, the design speed is 100km/h, the partial road section with Ningbo is maintained at 80km/h, and the roadbed width is 41m. The connection line adopts the two-way four-lane first-class road standard, the design speed is 60km/h, and the width of the roadbed is 23m. Keywords: engineering news, engineering construction information, engineering construction

Winning bid information

Candidate for winning the bid for this project: Zhejiang Shanghai-Hangzhou-Ningbo Expressway Co., Ltd. is a consortium formed with Shaoxing Transportation Investment Group Co., Ltd. Congratulations to the winning bidder! Editor / Zhao E


Comment

Related articles

Transportation

The electrification project of Qinghai Tibet Railway has started construction

12-16

Transportation

Uganda Kenya standard gauge railway technology docking reaches consensus

12-16

Transportation

Ground breaking for Quzhou section of Hangzhou Chunkai Expressway

12-16

Transportation

Invest 333 billion taka! Bangladesh railway launches modernization and speed increase

12-15

Transportation

The winning bidder for the Jinan Qihe section has been determined

12-15

Transportation

Anhui 24.79 billion yuan new expressway connects northern and central Anhui regions

12-15

Collect
Comment
Share

Retrieve password

Get verification code
Sure