Recently, the Diqiuni Community Hospital, which was donated by the 8.12 consortium of Power China Uganda's Karuma Hydropower Station, was successfully completed and a handover ceremony was held.
Ms. Amon Giberti, Minister of Labor of Uganda, Chairman of PSC of Karuma and Isimba Hydropower Project Management Committee, Presidential Commissioner of Oyam District, Commissioner of Oyam District of Ministry of Health, Legislative Chairman of Oyam District, MEMD of Ministry of Energy and Minerals A total of more than 110 people from the delegation, the MOH delegation of the Ministry of Health, the UEGCL delegation of the power generation company, the delegation of the Diqiuni community, the representatives of doctors and nurses from the Diqiuni Community Hospital, and the delegation of the Karuma Hydropower Station in Uganda attended the handover ceremony. The Ugandan government Representatives from all parties spoke highly of PowerChina's social responsibility fulfillment and project construction quality.
Diqiuni Community Hospital Project
The Diqiuni Community Hospital project completed this time is the second hospital that PowerChina donated to the local area while undertaking the construction of the Karuma Hydropower Station. The construction cost of the project is about 1.5 million US dollars. The completed and handed-over main body includes outpatient building, examination room, treatment room, consultation room, general outpatient room, laboratory, anti-HIV treatment room, radiation room, physical therapy room, pharmacy, disinfection room, Reference room, injection room, waiting area, meeting room, etc., equipped with blood pressure measuring instruments, microscopes and laboratory instruments, eye, ear, nose and throat examination instruments, vaccine and drug storage refrigerators, physiotherapy facilities, ultrasound scanners and other medical equipment, tables and chairs furniture etc.; newly build 2 sets of dormitories for medical staff, including bedrooms, living rooms, bathrooms, storage rooms, kitchens and related supporting facilities, as well as pumping and water supply (including rainwater collection), solar energy, hospital fences and gates, etc.
Ms. Amon Giberti, Minister of Labor, said in her speech that PowerChina has always been committed to corporate social responsibility on the basis of insisting on doing well in hydropower projects, and is committed to improving the living facilities of the local people and improving the living standards of the local people. Actions to benefit the surrounding communities and residents, on behalf of the local people, I would like to thank PowerChina for its selfless dedication.
In the future, the joint venture will continue to fulfill the social mission and responsibility of central enterprises on the road of the Belt and Road Initiative, and will continue to care and support the development of the Ugandan community and people as always, so as to continue the friendship and development. Editor/He Yuting
Comment
Write something~