On February 26, 2023, the first pile of the Shouxian section of the S1 line of Hefei Xinqiao Airport was officially drilled, which marked that the project has officially entered the substantive construction stage.
Line S1 of Hefei Xinqiao Airport
According to reports, the S1 line adopts city-area B-type vehicles with a design speed of 120km/h. The line starts at Shushan Industrial Park Station in Shou County and ends at Wulidun Station in Hefei. The total length of the line is 47.5km, with 14 designed stations. The main line of the Shouxian section is about 11.04km long, the elevated section is 8.04km, and the underground section is 2.4km. There are 2 stations, both of which are elevated stations, and a Shouxian parking lot. The total investment of the project is 4.013 billion yuan.

Hefei Xinqiao Airport Line S1 is the first urban (suburban) railway project in Hefei. The line connects Xinqiao International Airport and Hefei West Railway Station, two major transportation hubs, and realizes the rapid connection between the city center and the airport group and Shou County Xinqiao Industrial Park group. , This project is included in the National Development and Reform Commission's "Multi-level Rail Transit Planning in the Yangtze River Delta Region", which is of great significance for improving the comprehensive transportation system of Hefei Xinqiao Airport, strengthening the radiation function of the comprehensive transportation hub, and supporting the integrated high-quality development of Hefei.


Li Helin, project secretary of Hefei Xinqiao Airport Line S1 of China Railway 24th Bureau Group Co., Ltd., introduced that the first pile of Line S1 was officially drilled, which marks that the construction of Line S1 has entered a substantive stage. , Bridge construction has created favorable conditions. Line S1 can quickly connect Hefei City, the airport, and Xinqiao Industrial Park, providing fast traffic conditions for local economic and social development. Editor/He Yuting
Comment
Write something~