Wind power
Guangxi Baise 2.5 million kilowatt wind and photovoltaic project
Seetao 2023-03-15 09:57
  • Among them, 1.5 million kilowatts of wind power and 1 million kilowatts of photovoltaic power
  • The project plans to use unused land, abandoned mines, pond water surface, etc. in Tiandong County, Baise City for project development and construction
Reading this article requires
3 Minute

Since the 14th Five-Year Plan, the development of wind power and clean energy industries in various places has been booming. Recently, Longyuan Power and the Baise Municipal People's Government of Guangxi signed a cooperation framework agreement on a 2.5 million-kilowatt "source-grid-load-storage" integrated base project and a 20,000-ton lithium battery PVDF project.

The project is located in Tiandong County, Baise City. The region is rich in wind and light resources. The annual average wind speed is 5.75 meters per second, and the annual sunshine is more than 1,600 hours. It is the first "source network load storage" integrated base project in Baise City, Guangxi. The project plans to use the unused land, abandoned mines, pits and ponds in the county to develop and construct new energy projects. The planned development capacity is 2.5 million kilowatts, including 1.5 million kilowatts of wind power and 1 million kilowatts of photovoltaic power, and the supporting construction of a 500,000-kilowatt/1,000,000-kilowatt-hour energy storage project base (including the incremental distribution network in the park), to achieve the "double carbon" goal for Baise City Actively contribute. Editor/Xu Shengpeng


Comment

Related articles

Wind power

Guoxin Group invests in two major offshore wind power projects in advance

10-24

Wind power

Offshore wind power adds new momentum! Guoxin Group's 814MW project won the bid and landed

10-24

Wind power

Zhongtian Technology wins bid for 1.788 billion yuan ocean project

10-21

Wind power

Shandong Expressway Yuncheng Wind Power Project Starts Construction

10-21

Wind power

The million kilowatt wind turbine power plant in Tuha, Xinjiang has been settled

10-20

Wind power

China Power Construction signs wind power projects to support energy development

10-20

Collect
Comment
Share

Retrieve password

Get verification code
Sure