Central enterprises
Meixian County, Shaanxi via Qishan to Fengxiang Expressway Project Bid Opening
Seetao 2023-03-16 09:28
  • The estimated total investment of the project is 7.196 billion yuan, of which construction and installation costs are 5.109 billion yuan
  • The total length of the Guanzhong Ring Road Meixian to Fengxiang Expressway project is 73.737 kilometers, and the design speed of the whole line is 100km/h
Reading this article requires
5 Minute

On March 14, 2023, a reporter from Jiandao.com learned from Luqiao.com that candidates for the civil construction of the Guanzhong Ring Road Meixian via Qishan to Fengxiang Expressway Project in Shaanxi Province have been announced. The estimated total investment of the project is 7.196 billion yuan, of which construction and installation costs 5.109 billion yuan.

Project Overview

The starting point of the project is located in Doujiahe Village, Tangyu Town, Mei County, connected to the proposed Huzhoumei Expressway, and the end point is located in Zhuyuan Village, Ximiganqiao Town, Fengxiang, connected to Xunfeng Expressway. The total length of the project route is 73.737 kilometer. The main line adopts the two-way four-lane expressway standard, the roadbed width is 26 meters, and the design speed of the whole line is 100km/h. The design vehicle load level of the bridge and culvert adopts highway-I level, and the design flood frequency is 1/100.

This tender is for the construction of civil works in the scope of K50+466~K83+550.568 of the Meixian via Qishan-Fengxiang Expressway Project in Guanzhong Ring Road, Shaanxi Province, with a route length of 33.109 kilometers, including roadbeds, bridges and culverts, crossing works, roadbed slope greening and related ancillary project. Subgrade excavation is 3.0268 million m3, subgrade filling is 4.9626 million m3; 38 bridges, including 1941m/7 bridges, 1375m/22 middle bridges, 510m/9 overpasses; 45 culverts and 61 passages. There are 3 interchanges, 1 separate interchange, 1 connecting line 1.356km/1, 1 service area, 1 maintenance work area, and 1 management center. Keywords: engineering news, engineering construction, engineering construction information

Winning bid information

The first place in the bid for this project: China Railway 14th Bureau Group Co., Ltd. Congratulations to the winning bidder! Editor / Zhao E


Comment

Related articles

Central enterprises

Assistance to the Bahamas National Stadium Maintenance and Renovation Project

04-19

Central enterprises

China Railway Bureau 20 welcomes the college to visit and exchange

04-18

Central enterprises

CCCC and Yangzhou sign a strategic cooperation framework agreement

04-18

Central enterprises

CCCC South Korea Meets with Carlos, Portugal

04-15

Central enterprises

CSCEC and Sichuan Port Investment signed a strategic cooperation agreement

04-15

Central enterprises

Meeting between CCCC Fourth Aviation Institute and CNNC Fifth Company

04-10

Collect
Comment
Share

Retrieve password

Get verification code
Sure