Transportation
Reconstruction and expansion of Longling section of National Highway 219 started
Seetao 2023-03-22 08:35
  • The total length of the construction project is 94.544 kilometers, and it is expected to be opened to traffic by the end of 2025
  • After completion, the entire route will be shortened by 39 kilometers, and the traffic will be faster and more efficient
Reading this article requires
5 Minute

Recently, the commencement ceremony of the reconstruction and expansion project of the Longling Huangcaoba to Longzhen bridge section of National Highway 219 was held in Longling County, Baoshan City.

Reconstruction and expansion project of Longling section of National Highway 219

According to reports, National Highway 219 starts from Kanas, Xinjiang and ends in Dongxing, Guangxi, with a total length of 10,065 kilometers. It is the longest national highway on the southwestern border of China and the closest to the border. The total length of Longling County is 160.582 kilometers, and 26.939 kilometers of secondary roads have been built.

The Longling Huangcaoba-Longzhen bridge section, which was started this time, has a total length of 94.544 kilometers. It starts at Huangcaoba in Longling County, passes through Xiangda Town, Pingda Township, and Mengnuo Town, and ends at Nujiang Longzhen in Mengnuo Town. The whole line of the bridge adopts the standard construction of the second-class highway. The direct construction and installation cost of the project is estimated to have a total investment of 3.216 billion yuan. It is planned to be completed and opened to traffic by the end of 2025.

After the completion of the reconstruction and expansion project of the Longling Section of National Highway 219, it will be able to achieve fast and efficient transportation, which is of great strategic significance for improving the regional road transportation network, promoting the development of towns along the line, and border areas. After the completion of the project, it will comprehensively improve the traffic artery of Longling County, realize the fast and smooth connection between the county and townships, lay a solid foundation for the high-quality economic and social development of the county, and make the masses truly change from accessible to convenient. Editor/He Yuting

Comment

Related articles

Transportation

The opening of the China Kyrgyzstan Uzbekistan Railway has the Eurasian trade pattern

12-20

Transportation

From Cut off to Rail Alliance: Signing of the 785 kilometer high-speed railway in Shaka

12-19

Transportation

Ground breaking for the Shanghai Songjiang Expressway Rapid Development Project

12-19

Transportation

Liaoning Qinshen Phase II Expressway starts construction on the entire line

12-19

Transportation

G50 Shanghai Chongqing Expressway starts expansion from Dianjiang to Changshou section

12-18

Transportation

Wuhan Baishazhou Highway and Railway Bridge Connection Project won the bid

12-17

Collect
Comment
Share

Retrieve password

Get verification code
Sure