Transportation
Xiyan high-speed railway station building project is about to start
Seetao 2023-03-23 15:24
  • The main line of the new Xi'an-Yan'an high-speed railway has a total length of 299.8 kilometers
  • Among them, the length of the main line from Xi'an East Station to Tongchuan Station is 91.162 kilometers
Reading this article requires
7 Minute

On March 20, 2023, the "Announcement on the Pre-qualification of the Construction Unit Price Contracting Bidding of the Station Building Project of the Xi'an-Tongchuan Section of the New Xi'an-Yan'an Railway" was released. The construction of Gaoling, Fuping South and Tongchuan Stations of the West-Extended High-Speed Railway is about to start.

Tender conditions

The new Xi'an-Yan'an railway has been approved for construction by the "General Office of China Railway Corporation forwarded by the National Development and Reform Commission on the Approval of the Feasibility Study Report of the New Xi'an-Yan'an Railway (Tie Zong Ban Fa Gai [2018] No. 120), the project owner is Xicheng Railway Passenger Dedicated Line Shaanxi Co., Ltd., the construction funds come from China National Railway Group and Shaanxi Province. The funds other than the capital use domestic bank loans. The project investment ratio is 42% from China Railway Group and 58% from Shaanxi Province. The funds have been confirmed and the construction The drawings and design documents are complete, and the tenderer is Xicheng Railway Passenger Dedicated Line Shaanxi Co., Ltd.

Project Overview

The newly-built Xi'an-Yan'an high-speed railway leads from Xi'an North Station and Xi'an East Station, passing through Gaoling District and Yanliang District of Xi'an City, Fuping County of Weinan City, Yaozhou District, Wangyi District, Yintai District, Yijun County of Tongchuan City, and Huangshan District of Yan'an City. Ling County, Luochuan County, Fu County, Ganquan County and Baota District, to the existing Baoxi Railway Yan'an Station. The main line of the project has a total length of 299.8 kilometers, a design speed of 350 kilometers per hour, and a construction period of 4.5 years.

The main line of the west extension railway from Xi'an East Station (not included) to Tongchuan Station (included) is 91.162 kilometers long. The line passes through Xi'an City, Weinan City and Tongchuan City in turn, and the construction period is 3 years.

Bidding scope and bidding section division

Newly build the Gaoling Station, Fuping South Station, Tongchuan Station building, platform and other related projects within the scope of the Xi'an-Tongchuan section (DK000+000~DK88+310) of the Xi'an-Yan'an Railway.

Division of bids: This bidding is divided into 1 bid section, namely XYZF-1 bid section.

Main project contents: Gaoling Station (building area 5000㎡, steel structure area 2690㎡), Fuping South Station (building area 5999㎡, steel structure area 3757㎡), Tongchuan Station (building area 11999㎡, steel structure area 9410㎡) station rooms, platforms and other related works. The construction area of production and living houses is 22997㎡.

Planned duration

928 calendar days, planned start date: June 1, 2023, planned completion date: December 15, 2025.Editor/Ma Xue

Comment

Related articles

Transportation

China Railway Communications signs Egypt railway project

05-07

Transportation

Jizou Expressway refreshes project construction progress bar

05-06

Transportation

The Jiaozhou section project of the Jiaoji Expressway is accelerating

05-06

Transportation

Jiguang Expressway reconstruction and expansion project is about to be completed

04-30

Transportation

Land for the construction of this expressway in Shandong province was approved

04-30

Transportation

Completion of Train Loading Automation System in Shandong Port Area

04-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure