Hydroproject
The Jiuhua River System Treatment Project officially started construction
Seetao 2023-05-11 08:50
  • Jiuhua River System Treatment Project is the first phase project of Chizhou Modern Water Network Project
  • The main construction contents include embankment, river dredging, slope protection and bank protection, etc
Reading this article requires
10 Minute

Recently, the first phase of the modern water network project in Chizhou City, Anhui Province - the Jiuhua River System Treatment Project officially started construction. According to reports, the project is not only the first project to start construction after the Anhui Provincial People's Government signed a strategic cooperation agreement with the China South-to-North Water Diversion Group, but also the first cooperation project after the Chizhou Municipal People's Government signed a strategic cooperation agreement with the China South-to-North Water Diversion Group. A major water conservancy project in which social capital participates in cooperation.

Jiuhua River System Treatment Project

According to reports, the total investment of the Jiuhua River System Treatment Project is about 2 billion yuan. The project revolves around one axis and one center, three arteries, multi-points and multi-lines, and an overall layout of interconnection to comprehensively build water security, water resources, water ecology, water culture, Water management and governance system, the construction content includes: dikes, river dredging, slope and bank protection and other projects. After the completion of the project, the flood control standard of the river basin will be further improved, especially the flood control standard of the downstream section and the Bishan section will reach a 50-year occurrence. It will also be of great significance for deepening the protection of the Yangtze River and promoting economic and social development along the route.

Jiuhua River is a first-class tributary of the Yangtze River, originating from Mount Jiuhua, with a total length of 58 kilometers. It crosses Mount Jiuhua Scenic Area, Qingyang County and Guichi District, and flows into the Yangtze River at Meilong Street, Guichi District. The total area of the drainage basin is 532.8 square kilometers. The main tributaries include Badu River, Zhaojia River, Huayang River, Tongxi River, Maya River, Buling River, Shipu River, Bishan River and other rivers. There is Jiuhua Mountain Scenic Area in the drainage basin Jiuhua Town, Miaoqian Town of Qingyang County, Meilong Street of Guichi District and many other important towns.

China South Water Transfer Group is the only cross-basin company directly managed by the central government. It is a leading enterprise in the water transfer and supply industry, a leading enterprise in national water network construction, and a backbone enterprise in water security. It participates in the construction of three-level water networks in Anhui province, city, and county. Chizhou is the first city in China to complete the city-level modern water network planning, which provides an opportunity for cooperation between the two parties. The four tens of billions of water conservancy projects implemented in Chizhou City are deeply in line with the development strategy of China South-to-North Water Diversion Group to connect veins, connect networks, and strengthen chains.

Strategic Cooperation Framework Agreement Signing Ceremony

It is understood that the Chizhou Municipal People's Government cooperates with China South-to-North Water Diversion Group's five companies in water network and water affairs, new energy, ecological environmental protection, water network intelligence, and cultural tourism. Safety, water environment and water cultural tourism, new energy, smart water conservancy and other projects are the entry points. The recent investment of 10 billion yuan and the long-term investment of 30 billion yuan will help Chizhou's water conservancy infrastructure construction and build a new pattern of Chizhou's modern water network. .

In the next stage, the two sides will jointly promote Huamiao Reservoir, Gongxi Reservoir, Huamiao Gongxi Connecting Project, Guichi District and Shitai County Water Resources and Urban and Rural Water Supply Pipeline Project, Yangtze River Chizhou Section River Management Project, Jiuhua River System Management Project , Shengjin Lake Pumping Station Project and other major water conservancy project constructions, a water conservancy development model of resource integration, central-local cooperation, professional management, co-management and mutual benefit has been established, and it has become a model for water conservancy investment and financing reform in Chizhou that can be replicated, used for reference, and promoted. . Editor/He Yuting

Comment

Related articles

Hydroproject

Heilongjiang erosion gully treatment project begins in full swing

04-23

Hydroproject

The rotor of Unit 4 of Maerblock hydropower Station is hoisted into place

04-18

Hydroproject

Inner Mongolia Hetao Irrigation District kicks off summer irrigation

04-18

Hydroproject

Construction of the Shandong section of the Yellow River begins

04-18

Hydroproject

Tianjin Dongli Water Conservancy Facilities Project Starts Construction

04-17

Hydroproject

Water conservancy projects in Hunan have started intensively

04-17

Collect
Comment
Share

Retrieve password

Get verification code
Sure