Hydropower
Wangqing Pumped Storage Power Station Feasibility Study Report Passed Review
Seetao 2023-05-22 15:06
  • The first phase of Wangqing Pumped Storage Power Station has an installed capacity of 1,800 MW and a rated water head of 578 meters
  • After the completion of the power station, it will undertake the tasks of peak regulation, valley filling, energy storage, frequency regulation, phase regulation and emergency backup of the power grid power system of Jilin Province
Reading this article requires
4 Minute

With the development of renewable, clean and intelligent energy, the scale of pumped storage construction in China is accelerating. On May 17, 2023, the national "14th Five-Year Plan" key project - the feasibility study report of Wangqing Pumped Storage Power Station in Jilin Province successfully passed the review of the General Institute of Hydropower and Water Conservancy Planning and Design, laying a solid foundation for subsequent project approval and high-quality construction .

Wangqing Pumped Storage Power Station is an important part of the national base in western Jilin Province for consumption and delivery and the Three Gorges Energy Storage in Northeast Shanshui. It plays an important supporting role in optimizing the energy supply structure of Jilin Province and improving the development and consumption capacity of new energy resources. The project is invested and constructed by Jilin Electric Power Co., Ltd.

The first phase of the project has an installed capacity of 1,800 megawatts and a rated water head of 578 meters. After completion, it will undertake the tasks of peak regulation, valley filling, energy storage, frequency regulation, phase regulation and emergency backup of the power grid power system in Jilin Province. Consolidating the achievements of poverty alleviation, promoting the green transformation of energy in Jilin Province, and helping Jilin's overall revitalization have a positive role in promoting.

The passing of the feasibility study review marks that Jilin Electric Co., Ltd. has achieved phased results in the goal of "constructing new achievements" in the theme education, and will help Jilin Province accelerate the construction of a new pattern of energy development that complements east and west. Editor / Zhao E


Comment

Related articles

Hydropower

Henan Province Tangzhuang town Longtan pumped storage project signed

04-10

Hydropower

Excavation of main powerhouse of Gansu Zhangye pumped storage power station

04-09

Hydropower

The first unit of Zhejiang pumped storage power station was successfully lifted

04-03

Hydropower

The largest hydropower station in the upper reaches of the Yellow River

04-01

Hydropower

Kazakhstan Usek River Power Station Project Successfully Signed

03-27

Hydropower

ACWA Power successfully refinanced Bahrain's seawater desalination project

03-26

Collect
Comment
Share

Retrieve password

Get verification code
Sure