Macro
Guangdong has added 13 million kilowatts of coal power in the past three years
Seetao 2023-05-26 10:57
  • By 2025, the scale of gas power is expected to reach 55 million kilowatts
  • During the 14th Five-Year Plan period, promote the planning and construction of new coal power projects in accordance with the principles
Reading this article requires
6 Minute

On May 24, 2023, the Guangdong Provincial Energy Bureau issued the "Implementation Plan for Promoting High-quality Energy Development in Guangdong Province (2023-2025)", which details the goals for coal-fired power and gas-fired power installations.

In order to promote the construction of flexible gas power, comprehensively consider the peak shaving demand, construction conditions, natural gas resource guarantee, etc., and rationally plan the layout and construction of peak shaving gas power in the load center. Guide newly-built gas-electric units to be equipped with FCB functions, with isolated network operation capability and black-start function, to improve disaster resistance support capabilities; actively plan and build disaster-resistance protection power supplies in Shanwei, Zhanjiang, and Maoming cities. In areas with high heat load demand such as industrial parks and industrial clusters, rationally arrange natural gas cogeneration and distributed energy station projects in accordance with the principle of heat-fixed power, and implement centralized heating, power supply, and cooling for the region to achieve efficient energy circulation. use. By 2025, the scale of gas power is expected to reach 55 million kilowatts.

Gradually promote the transformation of coal power from basic power to basic security and system regulation power. Based on my country's coal-based resource endowment, during the 14th Five-Year Plan period, the planning and construction of new coal power projects will be promoted in accordance with the principles of establishing first and then reforming, ultra-supercritical, and not selecting new sites. For the coal-fired power units that have expired in service, combined with the power and heat supply and demand situation and the status of the units, they will be classified and disposed of according to the methods of life extension operation, shutdown without dismantling and conversion to emergency backup, shutdown and demolition. Promote the energy saving and consumption reduction of existing coal-fired power units, heating transformation and flexibility transformation, promote the extensive participation of coal-fired self-owned power plants in power peak regulation, and promote the development of CCUS technology for coal-fired power units and the integration and demonstration application of the whole process system. Editor / Xie Li

Comment

Related articles

Macro

China will send envoys to visit the Middle East in the near future

03-05

Macro

Beyond the Strait of Hormuz, the China Iran railway corridor provides an alternative route

03-05

Macro

Build another 200 kilometers of fence along the Gita border

03-05

Macro

Exposure: Large number of US fighter jets flying to the Middle East

03-05

Macro

China's Three Positions on the Current Situation in Iran

03-04

Macro

25 Chinese citizens evacuated from Iran return to their home country via Turkmenistan

03-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure