Construction
How is an offshore wind farm built in a minute
Seetao 2023-06-14 14:33
  • The global offshore wind industry will grow seven-fold by 2032 and account for 26% of total installed capacity within the next 10 years
  • Over the next decade, China's annual capacity additions will average 80 gigawatts, accounting for half of global capacity additions
Reading this article requires
2 Minute

Countries around the world are seeking to accelerate the energy transition, and offshore wind power is moving forward at a high speed! How is an offshore wind farm built? How is it different from the construction of onshore wind? How did the 100-meter high sea blower do it? Give me a minute to take you through the construction process of Longyuan Power Offshore wind Farm, a national energy group.

Over the next 10 years, 30 countries will increase their offshore wind capacity, but European countries and China will still account for 81% of new offshore wind capacity installed globally. At the end of 2022, China once again topped the list as the country with the most new offshore wind capacity after overtaking the UK for the first time in 2021. Editor/Xu Shengpeng


Comment

Related articles

Construction

Hebei TV praises Shantui's intelligent construction products

05-08

Construction

The track laying of the Xiangyang-Jingzhou High-speed Railway has started!

03-18

Construction

Shuangyashan Green Aviation Fuel Base officially launched

10-16

Construction

The autumn centralized construction of China's first heavy-duty Daqin Railway

10-08

Construction

The reconstruction project of the main trunk canal in Heihexi, Gansu Province was started

09-30

Construction

Jingzhou Libu Yangtze River Railway Bridge enters the main tower construction stage

09-29

Collect
Comment
Share

Retrieve password

Get verification code
Sure