Investment
The UAE wind power project undertaken by a Chinese enterprise won an award
Seetao 2023-06-21 10:12
  • A total of 23 wind turbines with a single unit capacity of 4.5 MW and 14 MW photovoltaic systems will be installed in the project
  • The UAE wind power demonstration project has great pioneering significance for the energy transformation of the local and even the entire Gulf region
Reading this article requires
5 Minute

Recently, Power Construction Corporation of China's UAE wind power demonstration project received the International Safety Excellence Cup from the British Security Council, marking that Power Construction Corporation of China's UAE wind power demonstration project stood out from nearly a thousand projects around the world and won the highest level award of the 2023 International Safety Award - Excellence Award.

International Security Excellence Trophy

Project Overview

The UAE wind power demonstration project, developed by Masdar, is the first demonstration wind power project implemented by Power Construction Corporation of China in the UAE, which is of great pioneering and symbolic significance in the UAE and even the entire Gulf region. The total installed capacity of the project is 117.5MW, consisting of 23 GW-155 models of 4.5MW wind turbines and 14MW photovoltaic systems.

The UAE Wind Power Demonstration Project under Construction

Among them, 23 wind turbines are distributed at four sites of the project, Sir Bani Yas Island, Delma Island, Sila, and Al Halah. The terrain includes islands and mountains, and the construction site is scattered. The transportation of large wind turbine equipment not only needs to overcome difficulties such as dredging of sea shipping channels and pier rectification, but also needs to overcome problems such as steep mountain terrain and large slopes, with high risk coefficient and high management difficulty. At the same time, local governments, owners, supervisors, and others also have high standards for project HSE management.

For this reason, since the commencement of the project, Power Construction Corporation of China has strictly controlled the entry audit of personnel and equipment, strengthened the management of hazardous work permit, safety technical disclosure, hidden danger investigation and treatment, emergency drill and other work, fully implemented the safety production responsibility of all staff, and constantly improved the level of safety control. It has been highly recognized by the local government, the owner, and the supervisor for many times. At present, it has achieved the record of 1 million safe man hours for the project.Editor/Ma Xue

Comment

Related articles

Investment

Gobi "Number Peak" Xinjiang Zero Carbon Computing Power Base Landing

02-02

Investment

Chinese enterprises sign land purchase agreement for equipment manufacturing in Egypt

01-30

Investment

Chinese Miner Bets $1 Billion on Brazilian Gold as Prices Soar to Record Highs

01-28

Investment

CATL Opens Largest EV Battery Service Hub in Saudi Arabia to Capture Middle East Boom

01-21

Investment

Chinese robot leader UBTECH settles in Kazakhstan

01-19

Investment

Luxembourg intelligent manufacturing project landed at Zhengzhou Airport

12-18

Collect
Comment
Share

Retrieve password

Get verification code
Sure