On June 25, 2023, the Chongqing Public Resource Trading Network announced the winning candidates for the franchise project of the Wushan Guandu section of the Xuanhan Kaizhou Yunyang Wuxi Wushan Expressway. The project has a planned construction period of 4 years and a total investment of 5.829 billion yuan.

Project Overview
Construction location: Within Wushan County, starting from the G42 Shanghai Chengdu Expressway Wushan Interchange, crossing the Yangtze River through Hongshiliang to Luojiazui, the Guandu Extra Long Tunnel passes through the Wangshan Xiashan Mountains to Guandu Town, and the end point is Guandu Town.
Project Overview and Construction Scale: The proposed implementation of this project is the Wushan Guandu section of the Xuanhan Kaizhou Yunyang Wuxi Wushan Expressway. This project starts from the Wushan Interchange of G42 Shanghai Chengdu Expressway, crosses the Yangtze River through Hongshiliang to Luojiazui, and sets up the Guandu Extra Long Tunnel to cross the Wangxia Mountains to Guandu Town. The terminal point is located in Guandu Town. In the long term, it can be connected to the planned Wanzhou Badong Expressway, with a total length of 18.125 kilometers and 7 bridges of 4025m, including 1 medium to large bridge of 1470m and 6 large to medium bridges of 2555m; There are 3 tunnels with a total length of 12752 meters, including 1 extra long tunnel with a length of 8450 meters and 2 long tunnels with a length of 4302 meters; Bridges and tunnels account for 92.6%; 4 interchanges, including 1 hub interchange and 3 general interchanges; 2 separate interchanges; Add 855 acres of permanent land. Key words: engineering news, engineering construction information, engineering construction

Bid winning information
The first winner of this project: the consortium of China Road and Bridge Corporation Co., Ltd. Congratulations to the winning bidder! Editor/Zhao E
Comment
Write something~