Hydropower
Gansu 2100MW Pumped Storage Project Feasibility Study Report Passed Review
Seetao 2023-07-21 08:52
  • The installed capacity of the power station is 2.1 million kilowatts, and the estimated total investment is about 13 billion yuan
  • The implementation of this project can effectively promote the development and consumption of renewable Energy development in Gansu Province, and promote the clean and low-carbon transformation of energy in Gansu Province
Reading this article requires
10 Minute

Pumped storage is an important way for countries around the world to ensure the safe and stable operation of their power systems. From July 18 to 20, the feasibility study report review meeting of Gansu Huanglong Pumped-storage hydroelectricity was held in Tianshui City. Yang Zeyan, the deputy chief engineer of the General Institute of Water Resources and Hydropower Planning and Design and the national survey and design master, presided over the meeting. After full discussion and deliberation, the expert group unanimously agreed to pass the review.

The Huanglong Pumped Storage Project in Gansu Province is a key implementation project of the National Pumped Storage Medium and Long Term Development Plan (2021-2035) released by the National Energy Administration, as well as a medium to long-term construction project under the Gansu Province Energy Development Plan. As the largest installed capacity pumped storage project approved by the Gansu Province during the 14th Five Year Plan, the Huanglong Pumped Storage Project is a new energy security strategy implemented by Xinhua Power Generation in the northwest region A landmark project to help achieve the "dual carbon" strategic goals and fulfill the political, economic and social responsibilities of central enterprises, with an installed capacity of 2.1 million kilowatts. The construction of the power station can effectively promote the development and consumption of renewable Energy development in Gansu Province, promote the clean and low-carbon transformation of energy in Gansu Province, and serve the green development of Tianshui. It plays an important role in achieving the national "dual carbon" strategic goals and the sustainable development of the province's social economy.

Wang Haoyun, chief staff member of the Price Cost Investigation Center of the National Development and Reform Commission, Niu Jianping, director of the New Energy Division of Gansu Development and Reform Commission, Jia Yixiang, member of the Standing Committee of Tianshui Municipal Committee and executive vice mayor, Zhang Yujing, member of the Standing Committee of Tianshui Municipal Committee and vice mayor, Liu Jipeng, deputy general manager of Xinhua Power Generation, Xia Jiantao, deputy general manager of Northwest Survey, Design and Research Institute, and Guan Zongyin, deputy chief engineer of the General Institute of Hydropower and Water Resources Planning and Design attended the meeting.

Jia Yixiang delivered a speech at the opening ceremony, expressing gratitude and welcome to the leaders, experts, and scholars who participated in the report review. He pointed out that the construction of the Huanglong pumped storage project in Gansu Province has received high attention and strong support from all sectors of society. The convening of this review meeting marks a crucial step forward in the comprehensive construction of the project. The Tianshui Municipal Party Committee and the municipal government will, in accordance with the opinions and suggestions of leaders and experts, work with each unit to optimize and improve one by one, actively coordinate services, ensure the orderly connection, strong promotion and effective implementation of follow-up work, and fully guarantee the construction of the project.

Before the meeting, the expert group and representatives also conducted on-site inspections at locations such as the upper and lower water reservoirs, geological exploration adits, and rock core observation points. At the meeting, Northwest Survey, Design and Research Institute conducted a special report, and participating experts and representatives fully discussed and reviewed the feasibility study report. They believed that the content and depth of work of the feasibility study report met the requirements, and unanimously agreed that the report passed the review.

Leaders and representatives of relevant departments of the governments of Gansu Province, Tianshui City, Maiji District and Qingshui County, members of the expert group of the General Institute of Hydropower and Water Resources Planning and Design, relevant leaders and representatives of the Deputy Chief Engineer of Xinhua Power Generation, the Engineering Construction Center, Xinjiang Xinhua Company, Henan Wuyue Company, Huanglong Pumping and Storage Company, Northwest Branch, State Grid Gansu Electric Power Company, and Power Construction Corporation of China Northwest Electric Engineering Institute attended the meeting. Editor/Zhao E


Comment

Related articles

Hydropower

Benefiting Millions! The San Gabán III Hydropower Station in Peru Starts Power Generation

05-08

Hydropower

The Sanjin Kaurala Hydropower Station is officially put into operation

04-10

Hydropower

Power generation of Burundi power station exceeds 250 million kWh

03-20

Hydropower

The world's first power station connected to the grid for power generation

03-13

Hydropower

Israel's largest pumped-storage hydropower station is put into operation

03-06

Hydropower

Breakthroughs in Overseas Operations of Hydropower Bureau 10

12-13

Collect
Comment
Share

Retrieve password

Get verification code
Sure