Construction
Hami to Chongqing UHV DC Transmission Project Commences
Seetao 2023-08-09 09:47
  • After the completion of this project, it can transmit over 36 billion kilowatt hours of electricity annually from Xinjiang to Chongqing
  • The ultra-high voltage transmission with large transmission capacity, long transmission distance, and low energy loss is currently the most advanced transmission technology in the world
Reading this article requires
4 Minute

On the morning of August 8, 2023, the Hami Chongqing ± 800 kV ultra-high voltage DC project of State Grid Corporation of China officially began construction. As the first DC ultra-high voltage project to be located in Chongqing, its construction also means that Chongqing will have the largest capacity of power transmission highway, which can significantly enhance the power supply capacity and help Chongqing accelerate the construction of a new grid pattern.

Project Overview

The Hami Chongqing project starts from the Balikun Converter Station in Hami City, Xinjiang Uygur Autonomous Region, and ends at the Yubei Converter Station in Yubei District, Chongqing. The transmission capacity is 8 million kilowatts, and the project investment is 28.6 billion yuan. Passing through five provinces (autonomous regions and cities) of Xinjiang, Gansu, Shaanxi, Sichuan, and Chongqing, the total length of the DC line is 2290 kilometers, with 62.4 kilometers within Chongqing and 59.5 kilometers of the receiving grounding electrode line. After the completion of this project, Xinjiang will form three ultra-high voltage direct current transmission channels, namely from Hami to Zhengzhou, from Zhundong to Wannan, and from Hami to Chongqing, continuously transmitting electricity to central, eastern, and southwestern regions.

The Hami Chongqing project is also one of the first batch of large-scale wind power and photovoltaic base transmission projects in the country. The project connects 10.2 million kilowatts of supporting new energy such as wind power, photovoltaic power, and solar thermal power, and 4 million kilowatts of supporting coal-fired power. After the project is put into operation, it will further optimize the energy supply pattern in Chongqing.Editor/Ma Xue


Comment

Related articles

Construction

Hebei TV praises Shantui's intelligent construction products

05-08

Construction

The track laying of the Xiangyang-Jingzhou High-speed Railway has started!

03-18

Construction

Shuangyashan Green Aviation Fuel Base officially launched

10-16

Construction

The autumn centralized construction of China's first heavy-duty Daqin Railway

10-08

Construction

The reconstruction project of the main trunk canal in Heihexi, Gansu Province was started

09-30

Construction

Jingzhou Libu Yangtze River Railway Bridge enters the main tower construction stage

09-29

Collect
Comment
Share

Retrieve password

Get verification code
Sure