New infrastructure
Zhejiang Wenzhou 110 kV Transmission and Transformation Project Approved
Seetao 2023-08-10 11:58
  • The construction site of this project is located in Furong Town, Yueqing City, with a total static investment of 90.21 million yuan
  • The 110kV electrical main wiring adopts internal bridge+line transformer group wiring in the future, and internal bridge wiring is used in this phase
Reading this article requires
4 Minute

Recently, the Wenzhou Development and Reform Bureau approved the Wenzhou Leqing Yannan 110 kV Transmission and Transformation Project. The construction site of this project is located in Furong Town, Yueqing City, with a total static investment of 90.21 million yuan.

Yannan 110kV Substation New Construction Project

Substation Main Transformer Vision 3 × 50MVA, construction 2 in this phase × 50MVA main transformer, using 110/10kV on load tap changer, with main transformer tap changer 110 ± 8 × 1.25%/10.5kV, wiring group YNd11, impedance voltage 17%. Three 110kV long-term outgoing lines, two in this phase; There are 36 10kV long-term outgoing lines and 24 in this phase.

The 110kV electrical main wiring adopts internal bridge+line transformer group wiring in the future, and internal bridge wiring is used in this phase; 10kV prospective adopts single bus four section wiring, and this phase adopts single bus section wiring. Vision Installation 3 × 3600+3 × 4800kvar capacitor bank, 2 installed in this phase × 3600+2 × 4800kvar capacitor bank. Three sets of arc suppression coils will be installed in the future of the substation, and two arc suppression coils will be installed in this phase × 630kVA.

Yangwan Fuyan π to Yannan Substation 110kV Line Project

New double circuit overhead line length 2 × 2.2km, double circuit cable length 2 × 0.03km, with newly built overhead and cable cross-sections of 300mm2 and 630mm2 respectively. The length of the renovated single circuit overhead line is 4.35km, and the cross-section of the overhead conductor is 300mm2. Editor/Zhao E


Comment

Related articles

New infrastructure

Yulin National Water Network Pilot Zone Project starts construction

10-11

New infrastructure

Jinshang UHV project west Chongqing section through the whole line

10-10

New infrastructure

Jiangsu Yunguli project starts construction

10-07

New infrastructure

The Karuma Hydropower Station in Uganda was officially opened

09-30

New infrastructure

Sichuan and Tianchuang optoelectronic display R&D and manufacturing base started

09-26

New infrastructure

Fuzhou Port Jiangyin Port Area adds 15 new energy tractor trucks

09-25

Collect
Comment
Share

Retrieve password

Get verification code
Sure