Recently, it was learned from the Development and Reform Commission of Guangxi Zhuang Autonomous Region that two wind power projects of Guangxi Beibu Gulf Land Sea New Energy Company have been successfully approved and approved! The wind power projects approved this time are the first batch of independent construction by local state-owned enterprises in Guangxi, with a total construction scale of 150MW.
It is understood that the two projects approved this time are Liangqing Nama Wind Farm and Liangqing Heyangshan Wind Farm, with the project site located in Liangqing District, Nanning City, Guangxi. The planned construction scale of two wind farms is 150MW, with the installation of multiple wind turbines, the construction of two new booster stations, and power collection lines.
After the project is completed, it is expected that the annual online electricity consumption will reach about 330 million kilowatt hours, with an average annual power generation income of about 120 million yuan. Compared with thermal power with the same power generation capacity, it can save about 100000 tons of standard coal annually and reduce greenhouse gas carbon dioxide emissions by about 330000 tons. Editor/Zhao E
Comment
Write something~