Infrastructure Projects
CNNC Huineng: Waste pit turned into "optical valley"
Seetao 2023-11-28 09:23
  • The 100-megawatt photovoltaic power generation project in the waste rock yard can save about 47,000 tons of standard coal every year.
  • Through the construction of photovoltaic projects in deep copper mine waste rock fields, the original abandoned mountainous areas have generated new economic value
Reading this article requires
5 Minute

This is a deep copper mine waste rock dump in Baiyin City, Gansu Province. As a resource-depleted city, Baiyin City has been striving to promote the restoration of the local ecological environment through scientific demonstration and precise policy implementation over the years in response to ecological damage problems left over from history such as deep copper mine waste rock dumps and tailings ponds, and constantly explore ways to green and sustainable development. Breakthrough.

At the end of 2019, CNNC Huineng signed a cooperation framework agreement with local enterprises to develop and construct a 100-megawatt photovoltaic power generation project in a deep copper mine waste rock yard, and promote the integration of ecological environment management and industrial development according to local conditions. The project will be completed and put into operation in February 2023 and will be connected to the grid to generate electricity.

Through the construction of photovoltaic projects in deep copper mine waste rock fields, new economic value has been generated in the originally abandoned mountainous areas. Each photovoltaic panel is like a huge "parasol", which can block light, cool down, and reduce surface water seepage. Through natural precipitation and ecological care, it is expected to gradually restore the damaged ecological environment and turn the former abandoned and polluted land into an "optical valley" with "surging" green electricity.

The 100-megawatt photovoltaic power generation project at the Baiyin Deep Copper Mine Waste Rock Site can save about 47,000 tons of standard coal every year. Through the "photovoltaic power generation + mine management" approach, the local area can achieve a win-win situation of ecological restoration and economic benefits. (This article comes from the official website of Seetao.com www.seetao.com and may not be reproduced without permission, otherwise it will be investigated. Please indicate Seetao.com + the original link for reprinting) Strategic Column Editor of Seetao.com/Xu Shengpeng


Comment

Related articles

Transportation

Papua, Indonesia: $200 million PPP project accelerates construction of Man-E toll road

07-25

Transportation

Construction of Dongshan Road Station of Shaoxing Metro Line 2 started

07-24

Hydroproject

Henan Hebi water conservancy project starts in full swing

07-24

New infrastructure

Hubei Chanling-Lingang 1000V Line Project Starts

07-22

Transportation

The "Tianshan" Urumqi Tbilisi international all cargo flight route has been opened

07-22

Transportation

Dapan Railway will be accelerated to start construction

07-21

Collect
Comment
Share

Retrieve password

Get verification code
Sure