Recently, the construction of Sichuan Provincial Highway 204, Nuo (Shuihe) Hua (Ying) Highway, Tongjiang County to Nuoshui River, which was invested and constructed by Sichuan Gonglv Industrial Co., Ltd., announced the construction tender announcement. Afterwards, it will help improve the general trunk road network of Sichuan Province, improve regional traffic conditions, and promote the development of tourism resources and economic and social development along the route.
This project is a new project. The main line starts from Nuojiang Town, Tongjiang County, connects to the existing Provincial Highway 204, intersects with Huancheng North Road, Tongjiang County, and runs north along the Xiaotong River Valley, passing through Fuyang Town and Xinchang The town, Qingyu Township and Banqiaokou Town stop at the Shamaopo of Nuoshuihe Town, and connect the Nuoshui River under construction to the Guangwushan First Class Highway. The total length of the route is about 52.809 kilometers. The main line newly built large and medium bridges (equivalent to the entire width) totaled 20323.45 meters / 123 blocks and 76 culverts. Newly built 7780.5 meters / 4 blocks (of which the Fuyang tunnel left line is 3695 meters and the right line is 3658 meters). Supporting traffic safety facilities. There are 7 connecting lines along the route, with a total length of 5.915 kilometers. This project adopts four-lane first-grade highway technical standards, with a design speed of 60 km / h, an integral subgrade width of 21.5 meters, a separate subgrade width of 10.75 meters, and a bridge width of 21.5 meters. The entire line uses asphalt concrete pavement. The bridge-culvert car load adopts Highway-I, the design flood frequency of the special bridge is 1/300, the large and medium bridge, small bridge (culvert) and subgrade are 1/100, and the peak acceleration of ground motion is 0.05g. The remaining technical indicators shall be implemented in accordance with the regulations issued by the Ministry of Highway Engineering Technical Standards (JTGB01-2014).
Any bidder who intends to participate in this project, please go to the Bazhong City Transportation Bureau website (http://jtysj.cnbz.gov.cn/) from April 29, 2020 to May 24, 2020 (Beijing time) ) And the national public resource trading platform (Sichuan Province) "other types of project systems" (website http://ggzyjy.sc.gov.cn/) to anonymously download tender documents. Submit the bid documents to the government service and public resource transaction service center of the Sichuan Provincial Government before 9:00 am on May 25, 2020. Editor / Zhao Yongjing
Comment
Write something~