Infrastructure Projects
The trial opening of the Honghe-Yuanyang section of Yuanman Expressway
Seetao 2020-07-30 17:23
  • After opening to traffic, the journey from Honghe County to Yuanyang County will be shortened to about half an hour
Reading this article requires
2 Minute

On July 27, 2020, the Honghe-Yuanyang section of the Yuan (Jiang) Man (Consumption) Expressway was completed and put into trial operation. The starting point of Yuan Man Expressway is in Yuanjiang County, Yuxi City, and the ending point is in Manhui Town, Gejiu City, Honghe Prefecture. The main line is 138.668 kilometers long. , Traverses the central area of Honghe Prefecture, passing through six counties and cities: Honghe County, Yuanyang County, Jianshui County, Gejiu City, Jinping County and Hekou County. The Honghe-Yuanyang section of the trial opening is 72 kilometers, including 15 tunnels and 120 bridges, with a roadbed width of 25.5m and a design speed of 80 kilometers per hour. It is the first section of the Southern Expressway currently under construction in Honghe Prefecture that is open to traffic (for reprinting, please refer to www.seetao.com). See Dao.com Editor/Xia Changwang

Comment

Related articles

Transportation

Kazakhstan Railway injects $300 million in funding

01-16

Transportation

Türkiye received $400 million AIIB investment to restart the border railway

01-16

Central enterprises

China Power Construction Corporation wins Iraq seawater desalination project

01-16

International

Brazil's 3 billion yuan railway funds leverage the investment landscape of billions

01-16

Infrastructure Projects

The new unit of the largest energy base in eastern Guangdong has been put into operation

01-16

Transportation

The super loop subway in Wuhan, China has arrived

01-16

Collect
Comment
Share

Retrieve password

Get verification code
Sure