Recently, the Wuhan Municipal Bureau of Natural Resources and Planning completed the "Wuhan City Post-epidemic Rejuvenation Plan (Three-year Action Plan)", which clarified the road map for rejuvenation within three years. Among them, the preliminary plan for the second Yangtze River Bridge in Jiayu County will Construction will start in 2025.
According to the plan, the starting point of the planned route plan for the Hannan River Crossing Channel of Wuhan Metropolitan Area is located on the west side of the Aviation Industrial Park (planning) of Caidian District, Wuhan City and the Shanghai-Chongqing Expressway, passing through Caidian District, Hannan District and Jiayu County from north to south. , And stop at the Wuhan section of the Wuhan-Shenzhen Expressway in Jiangxia District, Wuhan. Tentatively named Hanyan Yangtze River Highway Bridge, it is located in Guizhou Bay, Jiayu County, with a construction length of 27,600 meters, two-way six-lane construction standards, road width 33.5 meters, clear height 18 meters, main span 950 meters, and an investment of 3.5 billion yuan.
After the completion of the bridge, it will strengthen the interconnection between Wuhan and Jiayu, further alleviate the current status of traffic operation, facilitate people's travel, and promote the efficient development of the Wuhan metropolitan area. Editor/He Yuting
Comment
Write something~