Transportation
Ningde-Shangrao Expressway Ningde Xiapu-Fu'an section can be approved
Seetao 2020-09-22 15:49
  • The project is about 39.8 kilometers long, of which the newly built section is 33.9 kilometers at a speed of 100 kilometers per hour
Reading this article requires
4 Minute

Recently, the Fujian Provincial Development and Reform Commission approved the "Feasibility Study Report on the Ningde Xiapu to Fuan Section of the National High-tech Network of Ningde-Shangrao Expressway."

The project starts in Chibi Cha Village, Xiahu Town, Dongchong Peninsula, Xiapu County, Ningde City, and passes through Xinan Town and Yantian She Nationality Township after crossing the Dongwu Ocean, and ends at Xiapi Village, Xiwei Town, Fu’an City and Shenhai National Highway. The Wanwu hub interchange is connected to the Wanwu-Fuan section of the Ningde-Shangrao National Expressway that has been built. The total length of the route is about 39.8 kilometers, of which the newly built section is about 33.9 kilometers. The newly built Dongwuyang sea-crossing bridge is about 2.2 kilometers. The project adopts two-way four-lane expressway standard construction, with a design speed of 100 km/h, and a total investment of approximately 6.51 billion yuan.

The Ningde Xiapu-Fuan section project is a component of the Ningde-Shangrao Expressway of the National Expressway Network, and an important part of the first horizontal section of the "Fujian Expressway Network Plan (2016-2030)". After the completion of the project, it will improve the national and regional expressway network, improve the operation capacity and service level of the national highway, and promote the efficient development of economy and society. Editor/He Yuting

Comment

Related articles

Transportation

North and South Xinjiang enter the era of 8-hour direct travel

04-01

Transportation

18.5 billion yuan! China Communications Construction wins bid for a major project

04-01

Transportation

Xianning International Land Port breaks through again

03-31

Transportation

China Baotou Eyu High speed Railway Passes Review

03-31

Transportation

14.3 billion yuan! Guizhou Duan Dacun to Zunyi Railway is about to start construction

03-30

Transportation

2.5 billion US dollars! Tender for the southern railway corridor in Algeria launched

03-30

Collect
Comment
Share

Retrieve password

Get verification code
Sure