Central enterprises
Construction of Montepuez River Bridge Project in Mozambique starts
Seetao 2020-10-26 17:48
  • The total length of the Montepuez River Bridge Project in Mozambique is 600m and the construction period is 6 months
Reading this article requires
4 Minute

On October 27, 2020, China Road and Bridge issued an announcement. With the roar of motors and powerful impact sounds, the construction of the Montepuze River Bridge Project in Mozambique undertaken by China Road and Bridge started.

The Montepuze River Temporary Bridge Project is located on the N380 main road of the Province of Cabo Delgado in Mozambique. The length of the line is 600m, including the roadbed on both sides of the north and south banks and the steel trestle bridge across the Montepuze River. The north and south subgrades are connected to the original national road N380. The connection length is 375m, including the north subgrade of 134m, and the south bank subgrade of 241m. The main bridge is Bailey steel trestle, and the bridge span is arranged in 3 units×5 spans×15m=225m. This project is the most important and urgent project of the Mozambique government in 2020.

Next, the project will strengthen on-site management and control, use existing personnel and machinery to closely cooperate, complete the Montepuze River temporary bridge project with high quality and efficiency, and improve the ability of all project staff to deal with emergencies through regular drills and the "emergency number" at night . Focus on production with one hand and safety with the other to ensure the smooth completion of the project.

The Montepuze River Bridge project is the only passage from the port of Pemba in Mozambique to the northern natural gas development block. It is a key path for the supply and transportation of construction materials. It will play a pivotal role in the development of natural gas in northern Mozambique and the future economic development of the country. Editor/Peng Xue

Comment

Related articles

Central enterprises

Sany Group deepens strategic cooperation with CCC

03-22

Central enterprises

Huadian Investment builds 160 MW Aktau gas-fired power station

03-22

Central enterprises

CHINA HUANENG participates in the development of new energy projects in Kyrgyzstan

03-18

Central enterprises

CCTEG and middling coal signed a strategic cooperation agreement

03-18

Central enterprises

PowerChina signs 13.962 billion yuan solar storage project contract

03-13

Central enterprises

CEEC Northwest Institute Wins EPC Contract for Shengli Power Plant Cogeneration Project

03-12

Collect
Comment
Share

Retrieve password

Get verification code
Sure