On January 22, 2021, the "One-time Public Announcement of Environmental Impact Assessment Information for Xining-Huangshengguan Section of Xining-Chengdu Line of New Railway (Xining Section)" was released on the website of Xining Municipal People's Government.
Overview of Xicheng Railway Project
The Xicheng Railway spans Qinghai, Gansu, and Sichuan provinces. The main line is 833.1 kilometers long, of which 499.1 kilometers are newly built from east to west to Huangshengguan, and 307.75 kilometers are shared with the Chenglan Railway under construction. The existing Lanxin high-speed railway is 26.3 kilometers. Kilometers.
Newly built 14 intermediate stations including Hualong, Jianzha, Tongren, Ganga, Xiahe, Tanggaang (freight connection stations), Hezuo, Luqu, Langmusi, Huahu, Asi, Ruoergai, Banyou, Hongyuan, etc. . The whole line will be constructed at the same time, starting from the cooperation to Huangshengguan in the early stage (five and a half years), and from Xining to the later stage of the cooperation (seven and half years).
The design speed of the whole line is 200 km/h, of which the Langmusi to Hongyuan section can reach 250 km/h, and some sections have reserved speed-up conditions. The total investment of the project is about 78.08 billion yuan.
It is understood that the Xicheng Railway is an important part of the “eight vertical and eight horizontal” Zhonglan (West)-Guangzhou high-speed railway passages in the national medium and long-term high-speed railway network. After the entire line is completed and put into operation, it will only take 4.5 hours to reach Xining from Chengdu. Shorten the time by half, and can drive mobile trains. Editor/He Yuting
Comment
Write something~