Central enterprises
China Railway Bridge Bureau Zhanjiang Tunshun Cross-sea Bridge closed smoothly
Seetao 2021-01-25 14:28
  • The main bridge is 591 meters long and the main span is 296 meters. It is a cable-stayed bridge with two towers and two cables
Reading this article requires
6 Minute

On January 25, 2021, the first bridge built with Chinese and local culture as the design concept of the China Railway Bridge Bureau, the Tiaoshun Cross-sea Bridge was closed, and the closing task was completed 2 months in advance.

Bridge details

As a part of the northern line of the Bay Area Ring in the Zhanjiang City Road Network Planning, the bridge is an important link between Zhanjiang City and Haidong New District. It is a powerful measure to build a beautiful coastal emerging city and a port industrial city. , Docking and serving the Guangdong-Hong Kong-Macao Greater Bay Area, assisting the construction of provincial sub-central cities, and accelerating the rapid economic development of the western part of Guangdong plays an important role.

The Diaoshun Sea Crossing Bridge is located in the northern part of Zhanjiang City, Guangdong Province, with a total length of about 9.36 kilometers. It crosses Zhanjiang Bay and connects the east and west banks of Zhanjiang City. The main bridge of the bridge is 591 meters long, with a main span of 296 meters. It is a cable-stayed bridge with two towers and two cable planes. The entire bridge deck is 37.5 meters wide, with 6 lanes in both directions and a design speed of 80 kilometers per hour. As an important connecting carrier of Zhanjiang's "One Bay and Two Banks", the bridge is based on the theme of "Smooth weather, Zhanjiang Red Gate". It integrates important traffic routes and bay landscape. After completion, it will become the top of Zhanjiang Bay, which can be called "strength and beauty." "The city's landmark bridge is a tribute to the centenary of the founding of the party.

The main girder of the bridge adopts a flat streamlined fully enclosed steel box composite girder structure, divided into six types, with a total girder length of 591 meters and a total of 53 girder sections. The stage construction shall be carried out in the order of erection of pier top block, cantilever assembly, side span closure and mid span closure. After the bridge deck has been stored for 6 months and meets the design requirements, it will be superimposed with steel box girder in the factory for construction, and then "cross the ocean" for more than 2,000 kilometers, and transported to the bridge location of the Tiaoshun Cross-sea Bridge. Erect.

The bridge is the first PPP project in Zhanjiang City. It is a key project in Guangdong Province. After its completion, it will build a fast-track external link between Zhanjiang City’s "North Link Expressway, Nantong Port Area, West into the City, and East Link to the Airport". The urban skeleton, changing the urban traffic pattern, has a positive effect on promoting regional development and urban development. Editor/Peng Xue

Comment

Related articles

Central enterprises

Zhonglian Union won bid for the Wuji County Industry City Education Integration Project

01-06

Central enterprises

Power Construction Corporation of China wins contract for a natural gas station in Türkiye

01-04

Central enterprises

State Grid selected as one of the top ten super projects of central enterprises in 2025

01-04

Central enterprises

China Energy Engineering Northeast Institute wins the Uzbekistan power grid PC project

01-02

Central enterprises

TGME Gold Mine Accelerates with Chinese Backbone: Equipment and Infrastructure

12-31

Central enterprises

Southern Road Machinery wins 1.2 trillion yuan order for core hydropower equipment

12-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure