Municipal
Blow the Charge! Construction of Yihe Elevated Road has officially started!
Seetao 2021-02-20 16:08
  • After the completion of Yihe Elevated Road, it will become a demonstrative benchmark project in Linyi City
Reading this article requires
10 Minute

The red flag is inviting exhibits and the machinery is roaring. In order to set off a full-scale project construction boom and create a strong atmosphere for accelerated project construction, on February 20, 2021, the mobilization of key urban construction projects in Linyi City and the groundbreaking ceremony of the Yihe Elevated Road are in the high-tech zone Yihe Elevated Road Project The western starting point was grandly held.

The Yihe Elevated Road Project is the first batch of new projects started after the Spring Festival in Linyi City, and it is also the single urban construction project with the largest investment scale in Linyi City in recent years, with a total investment of 8.8 billion yuan. This project is an important part of Linyi City's "Three Rings and 15 Shots" skeleton road network planning. It is of great significance for building an urban express road network system, alleviating urban traffic congestion, promoting the development of areas along the line, and promoting the integrated development of the city.

The project starts from the G2 Beijing-Shanghai Expressway Luozhuang toll station in the west and ends on the east side of Wenquan Road in the east, with a total length of about 20 kilometers. The whole line adopts the express road form of main line elevated + ground auxiliary road. The main line is two-way 6 lanes, and the auxiliary road is a two-way 8-lane non-slow travel system. The design speed of the main line is 80 km/h, and the design speed of the auxiliary road is 60 km/h. The face width is 60 meters. There are 12 pairs of elevated upper and lower ramps, 3 pairs of ground entrances and exits, and a total of 5 interchanges with Beijing-Shanghai Expressway, Mengshan Avenue, South Yimeng Road, Binhe Road, and Binhe East Road are newly built. The project is planned for two years.

In 2021, there will be 216 new projects planned in the urban area with a total investment of 53 billion yuan, and 84 continued projects will be continued with a total investment of 34.7 billion yuan. The Municipal Housing and Urban-rural Construction Bureau insists on the word "morning" and the word "quick", and does everything possible to grasp the resumption of key urban construction projects. For new projects, make good use of the green channels, speed up the preliminary procedures, and strive to start construction as soon as possible; for continued projects, scientifically arrange personnel and machinery, seize the time, speed up the progress, and strive for early completion. Among them, 7 key urban construction projects, including the Olympic Sports Center, Taoran Viaduct, and Beijing Road Yihe Bridge reconstruction, were under normal construction during the Spring Festival; 33 urban construction projects including Wuhan Road Shehe Bridge and West Zhonghuan Dashan Road Interchange were resumed on the third day of the first month; Wuhan Road Construction of 26 urban construction projects including complete infrastructure, restoration of the riverside scenic spot water damage project in 2020, and beach bathing beach renovation project started today. As of the end of February, the first batch of 92 urban construction projects with a total investment of 38.4 billion yuan will start construction. According to statistics, in January 2021, 2.264 billion yuan of investment in urban construction projects in the urban area will be completed, achieving a good start.

In order to ensure that the Yihe Elevated Road will be built into a high-quality and high-quality project, the construction units Shandong High Speed Group, Tianyuan Construction Group, and Linyi Municipal Group will increase investment in personnel and machinery and equipment to ensure safe, civilized and environmentally friendly construction, and complete the construction tasks on schedule with quality and quantity.

Spring returned, fresh starts for everything. The groundbreaking ceremony opened the curtain of urban construction. The Linyi City Housing and Construction Department will give full play to the role of the main force, sound the charge, issue a mobilization order, and cooperate with all levels of departments and the majority of participating units to seek breakthroughs and make concerted efforts to ensure " The 14th Five-Year Plan has a good start and a good start, in order to comprehensively promote the strategic deployment of "six strong, six rich, six refined" and realize the strategic transformation of Linyi from "large to strong, from beautiful to rich, from new to refined" Actively contribute. Editor/Sang Xiaomei

Comment

Related articles

Municipal

G228 Dandong Line Nangu Section Repair and Maintenance Project Commences

10-16

Municipal

EPCC General Contract for 300000 Tons Propane Dehydrogenation to Polypropylene Project

09-25

Municipal

Pakistan's white oil pipeline construction is about to start

09-20

Municipal

Kazakhstan's manufacturing industry surpasses mining industry for the first time

09-12

Municipal

Nanchang AMEC GaAs-based LED MOCVD equipment project was signed

09-11

Municipal

From northern Shaanxi to Guanzhong, the 750 kV channel started

09-02

Collect
Comment
Share

Retrieve password

Get verification code
Sure