Transportation
Urumqi-Jiang Railway Capacity Expansion and Reconstruction Project Wins Bid List
Seetao 2021-03-05 15:06
  • After completion, the road network coverage will be expanded and the regional road network structure will be improved
Reading this article requires
6 Minute

On March 4, 2021, the Beijing Municipal Public Resources Trading Center announced that the construction project of the Ganquanbao to Jiangjunmiao section of the Xinjiang-Wujiang-Jiangsu Railway Expansion and Reconstruction Project has won the bid. The estimated total investment of the project is about 2.5 billion yuan.

China Railway 15th Bureau Group Co., Ltd. won the bid for station front section 1 with 950 million; China Railway 21st Bureau Group Co., Ltd. won the bid for station front section 2 with 600 million; China Railway Construction Electrification Bureau Group First Engineering Co., Ltd. won the bid for station with 480 million Post bid section 1; China Railway Wuhan Electrification Bureau Group Co., Ltd. and China Railway Communication and Signal Co., Ltd. won the bid for station post bid section 2 with 530 million yuan; Urumqi Railway Construction Engineering Consulting Co., Ltd. won the bid for supervision bid section 1 with 17.5 million yuan; Beijing China Railway Chengye Engineering Construction Supervision Co., Ltd. won the bidding for Supervision Section 2 with RMB 12,940,130.

Overview of Wujiang-Jiang Railway Capacity Expansion and Reconstruction Project

Wujiang Line and Zhundong Line are located in Urumqi City and Changji Prefecture in Xinjiang Uygur Autonomous Region. The Wujiang Line starts from Wubei Station in the Urumqi Railway Hub in the west, and passes through Midong District of Urumqi City, Urumqi City National Ganquanbao Economic and Technological Development Zone, Fukang City, Autonomous Region-level Fukang Industrial Park, and Beisantai Loop in Jimsar County. Zhundong Station will be established in the Economic Industrial Park, Changji State National-level Zhundong Economic and Technological Development Zone to Wucaiwan Mining Area of Zhundong Coalfield, and then along the south side of Z917 Line (Zhundong Highway) in Zhundong Coalfield to the east, and finally line Z917 and S228 The Jiangjunmiao mining area in the Zhundong coalfield on the west side of the intersection has a total length of 257.035km. Zhundong Line is a branch railway from Zhundong Station of Wujiang-Jiangsu Railway to Wucaiwan Mining Area, with a total length of 7.005km. Newly build the Sanping to Toutun River upstream and downstream tie line project with a total length of 10.2 km.

As the main railway passing through the mining area, the Uzbek-Jiangsu-Jiangsu-Jiangxi Railway will expand and transform the construction of the Uzbek-Jiangsu-Jiangsu special line, which plays an important role in the organization of railway transportation in the region and the improvement of the transportation efficiency of the main railway and the special line. Editor/Sang Xiaomei

Comment

Related articles

Transportation

Construction of Lanxi Section of Jianwu Expressway is about to begin

04-19

Transportation

Nanchang will add a new expressway to Chaozhou

04-18

Transportation

The signing ceremony for Kazakhstan's first urban light rail project was held

04-18

Transportation

The site selection of Shandong Lanling General Airport was officially approved

04-18

Transportation

The Wanbi project in Indonesia has entered a critical stage

04-17

Transportation

Shaanxi's first county-level airport project starts construction

04-17

Collect
Comment
Share

Retrieve password

Get verification code
Sure