Transportation
Shijiazhuang 14th Five-Year Rail Transit Construction Plan has been released
Seetao 2021-03-19 11:32
  • During the 14th Five-Year Plan period, Shijiazhuang will speed up the construction of a modern comprehensive transportation network
Reading this article requires
15 Minute

Recently, the 14th Five-Year Plan for National Economic and Social Development of Shijiazhuang City and the outline of long-term goals for 2035 have been released. Regarding the improvement of the modern transportation network, it mentioned speeding up the construction of a modern comprehensive transportation network with high-speed railways, intercity railways, expressways and aviation as the main body, building an important national transportation hub, improving the internal rail transportation system of the metropolitan area, and realizing a transportation hub Better coupling with urban functions.

Speed up the construction of intercity railways outside the metropolitan area, promote the construction of intercity railways between Shijiazhuang and Xiongan New Area, and create a fast passage between Shijiazhuang and Xiongan New Area. Speed up the construction of Shiheng-Canggang intercity railway, and unblock the convenient passage between Shijiazhuang and Bohai Bay. Plan to implement the Shihan Intercity Project to unblock convenient passages between Shijiazhuang and Central and Southern Hebei and the Central Plains Economic Zone. Promote the "four networks" of high-speed railways, intercity railways, urban (suburban) rapid rail transit, and urban rail transit, and build a one-hour rail commuter network between Shijiazhuang and Xingtai, Xinji, Dingzhou, and Yangquan.

Accelerate the construction of rail transit within the metropolitan area and basically form a backbone network of rail transit in the central city. In 2021, start the construction of the main city to Gaocheng city area (suburban) railway, and plan to connect the main city to Luquan District, Luancheng District, mining area and Zhengding Airport. Rapid rail transit planning and construction, speeding up the formation of a rail transit network that connects main cities, clusters, public stations at 500 meters, and efficient connection of main functional areas, explores the integration of urban rail transit and urban development, and coordinates the development and utilization of land around rail transit stations. Promote the construction of TOD city complex.

Build Shijiazhuang on the track

Promote the planning and approval of lines 4, 5, 6, and 7 of the second phase of the urban rail transit construction project, strive to start all construction during the "14th Five-Year Plan" period, and promote the rapid integration of rail transit in the main urban area.

Metropolitan Urban Rail Network

Focus on planning an urban (suburban) railway network covering the entire city, open up the urban development framework, and promote the integrated development of the metropolitan area. Study the possibility of using the surplus capacity of national and local railways to open urban (suburban) railways; actively explore the construction model of “urban construction and sharing”, start the main urban area to Gaocheng urban (suburban) railway in 2021, and plan for Luquan, Luancheng, mining area and Zhengding Airport's urban (suburban) railway transportation project 85 pre-study and project approval work, striving to start part of the construction during the "14th Five-Year Plan" period.

TOD

Integrate the construction of rail transit with the development of land around the line stations to optimize urban space, boost economic development, and at the same time feed back the construction of rail transit. During the "14th Five-Year Plan" period, combined with the construction of the second phase of the urban rail transit construction project and the construction of the new third district (suburban) rapid rail transit project, the construction of the Beile area will be accelerated to form a population of 100,000, and the TOD new city will be actively planned around the line station Center, started the construction of the TOD comprehensive development pilot project.

aviation

Accelerate the construction of the reconstruction and expansion project of Shijiazhuang Zhengding International Airport, support the accelerated construction of Xingtang General Airport, plan the construction of Zanhuang General Airport, Luancheng Airport reconstruction and expansion projects, the Shijiazhuang general aviation operation base of the sky, and the integration of UAV production, research and training for the Tianyu aviation industry The base project and Xingtang Airlines 5S Cultural Industry Park promote the relocation of Shijiazhuang Airport of the Air Force.

railway

Enhance the status of Shijiazhuang as a national comprehensive transportation hub, construct the high-speed railway line in the northwest of Shijiazhuang, the expansion and transformation of the railway line of Hebei Qianhao Group, the upgrading and transformation of the environmental protection relocation project of Hegang Shigang, the special railway line for the Jingxing mining area, the transformation of Shijiazhuang North Station, etc. A batch of projects.

highway

Accelerate the planning and construction of Jinshi and Hengxi expressways, actively plan to promote the planning and implementation of Shixin and Qingwei expressways, and plan to construct auxiliary road projects from Shijiazhuang Airport to Wutaishan Expressway and Xibaipo Expressway.

Speed up the construction of urban expressways

Shijiazhuang Ring Road Bundling Project, Shihuan Road Auxiliary Road SL91 Liang to Xigucheng Section, Provincial Highway S234 Yiguan Line Zhaohu Village to Dongluoshang Village Section, Provincial Highway S249 Zhengnan Line Jiacun to Lingshou County City Section, Provincial Highway S542 Yuan-Zan Line Zanhuang Section, Provincial Highway S248 Zhengfan Highway Zhengding to Xingtang Section, National Highway Xingyang Line (Xinglong-Yangjiang) Shahe Bridge and Road Engineering, National Highway G307 Jinju City Section, National Highway G308 Zhaoxian City Surrounding the city, north extension of Xincheng Avenue, north extension of Taihang Street, north extension of West Second Ring Road, Shilian Road to Gaocheng Jianshe Road, Jingxing County Provincial Highway S339, west extension to Didu Jijin freight channel and bulk logistics transportation channel, Shijiazhuang Zhengding International Airport To Wutaishan Highway.

Bus Hub Station

Speed up the construction of Shijiazhuang Comprehensive Bus Terminal, Gaoyi New Area Bus Station, Zhengding Bus Depot, Zhengding New Area West Linji Parking Lot, Zhengding New Area Zhufutun Departure Station, Baifo Bus Depot, Lingshou County Comprehensive Transportation Hub Center and other projects. Editor/He Yuting

Comment

Related articles

Transportation

Over 2 billion US dollars! COSCO Shipping plans to build 12 LNG dual fuel container ships

04-03

Transportation

Wuhan Hub Direct Line officially starts construction

04-03

Transportation

Wuhan Hub Direct Line Cross River Bridge Construction Starts

04-02

Transportation

North and South Xinjiang enter the era of 8-hour direct travel

04-01

Transportation

18.5 billion yuan! China Communications Construction wins bid for a major project

04-01

Transportation

Xianning International Land Port breaks through again

03-31

Collect
Comment
Share

Retrieve password

Get verification code
Sure