Hydroproject
The water diversion project in central Yunnan sets a monthly excavation record
Seetao 2021-04-27 10:35
  • The Central Yunnan Water Diversion Project is a foundation project in Yunnan. The tunneling length reached 663 meters in April
Reading this article requires
5 Minute

On April 26, 2021, the large-diameter full-face hard rock tunnel boring machine (TBM) "Yunling" for the Xianglushan Tunnel, serving the world-class water diversion project-Dali Section I of the Central Yunnan Water Diversion Project of China Railway Tunnel Bureau "Achieving another good result, the tunneling length reached 663 meters in April, breaking the domestic record of the highest single-month footage of the same level of tunnels, and setting the highest monthly footage record since the beginning of the excavation, marking that the project construction has entered a stage of comprehensive tackling.

Since the "Yunling" TBM (9.83 meters in diameter) passed through the huge rock-filled mega-karst cave on January 24, 2021, the daily excavation progress has continued to sprint and climb. On April 19, the "Yunling" TBM achieved a single-shift maximum footage of 20.6 meters and a single-day maximum footage of 38.6 meters (the surrounding rock conditions of the full arch support section). Now, it has set a record of the same level of tunnel diameter in TBM in China. The highest monthly footage record.

On-site technical service team

The "Yunling" TBM ran out of "acceleration" and continuously broke through the daily and monthly footage records, which is of decisive significance for the early completion of the Central Yunnan Water Diversion Project. Behind the monthly record is the spirit of overcoming difficulties and fulfilling their duties by the China Railway Equipment Technical Service Team. Next, the company’s technical service personnel will continue to uphold the tenet of "immediate response and high-quality service", with full enthusiasm and a more pragmatic style. All in one go and go all out to provide guarantee for the smooth completion of the central Yunnan water diversion project.

It is reported that the Central Yunnan Water Diversion Project is a basic project for the sustainable development of Yunnan Province. After the project is completed and put into operation, it can fundamentally solve the urban domestic and industrial water problems in Central Yunnan, and take into account the development of agriculture and ecology. It has significant economic and social development. And ecological benefits. Editor/He Yuting

Comment

Related articles

Hydroproject

134.9 billion! Yunnan Water Conservancy Investment Promotion Conference held in Kunming

04-01

Hydroproject

1.446 billion yuan! Winning the bid for the construction of Chengdu Sanba Reservoir

03-31

Hydroproject

Hunan's first 'dual' water conservancy project launched

03-31

Hydroproject

Update on the progress of the South to North Water Diversion Super Project

03-31

Hydroproject

16.8 billion! Gansu Tao River Extension Project launches survey and design

03-31

Hydroproject

The construction of the Yangtze River Anlan Barrier Chizhou Project has commenced

03-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure