Municipal
17 major projects in Ningbo started concentratedly
Seetao 2021-06-22 17:00
  • The 17 projects started this time with a total investment of 10.56 billion yuan, covering people's livelihood, industry and other fields
Reading this article requires
29 Minute

On the morning of June 22, 2021, at the site of the Ningbo Bay Overseas Chinese Town Happy Coast Hotel and the commercial complex, Fenghua District, Ningbo, held a concentrated start-up activity for major projects to expand effective investment. According to reports, the 17 projects started this time with a total investment of 10.56 billion yuan, covering people's livelihood, industry, commerce and other fields, once again sounded the storm of chasing and surpassing.

Overseas Chinese Town Happy Coastal Hotel and Commercial Complex Project: Located in the south of Happy Coastal Cultural Tourism Town in the center of Ningbo Bay Tourism Resort, to Tianfei Lake in the south and Sunshine Lake in the north. The total investment of the project is about 1.62 billion yuan. The construction unit is Ningbo Binhai Overseas Chinese Town Investment and Development Co., Ltd. The construction period is 2021-2024. The total land area of the project is about 127 acres and the construction area is about 160,000 square meters. The construction content is a 12-story five-star resort hotel with a height of 50 meters, a 40,000 square meters group style commercial block, and 80,000 square meters of commercial facilities. And high-end wellness apartments, 3 international master art galleries designed by Pritzker Prize winner Tom Mayne, etc. It is planned to invest 230 million yuan in 2021, and the pile foundation will be constructed during the year.

Ningbo Bay International Hospital (Fenghua Binhai Hospital) project: Located in the east area of Ningbo Bay Tourism Resort, north to Yanghu East Road and south to Binhai South Road. The total investment of the project is about 2 billion yuan. The construction unit is Ningbo Tongyuan Stem Cell Technology Co., Ltd., and the construction period is 2021-2024. The project covers an area of about 180 acres and a building area of about 210,000 square meters. It is designed and constructed according to the standards of a tertiary general hospital and is positioned as an international hospital with 1,500 beds. It is planned to invest 100 million yuan in 2021, and the pile foundation will be constructed during the year.

Fenghua Binhai Experimental School Project: Located in Song'ao New City, Ningbo Binhai Tourism and Leisure Area, with the river in the north and Guizhou No. 1 in the east, it is a supporting project of Ningbo healthy tourism town. The total investment of the project is about 400 million yuan. The construction unit is Ningbo Suihua Real Estate Co., Ltd., and the construction period is 2021-2023. The project covers an area of about 86 acres and a building area of about 40,000 square meters. The construction content is a nine-year school with a scale of 45 classes. It is planned to invest 60 million yuan in 2021, and the pile foundation will be constructed during the year.

Time Ningbo Paradise Project: Located in the west of Ningbo Bay Tourism Resort, north to the coastal middle line and south to Tianfei Lake, it is an operating sub-project of the PPP project. The total investment of the project is about 560 million yuan. The construction unit is Hongyuan Sports Technology Group (Ningbo) Co., Ltd., and the construction period is 2021-2024. The land area of the project is about 181 mu, and the construction area is about 100,000 square meters. The construction content includes indoor water park, ice and snow pavilion, art center, etc. It is planned to invest 120 million yuan in 2021, and the pile foundation will be constructed during the year.

Public boat terminal project: Located in the east of Ningbo Bay Tourist Resort, on both sides of the east embankment of Tianfei Lake. The total investment of the project is about 210 million yuan. The construction unit is Ningbo Damei Gulf Tourism Development Co., Ltd., and the construction period is 2021-2023. The construction content of the project includes a yacht port, a sailing port, and a gourmet port. In 2021, it plans to invest 80 million yuan to complete the construction of a sailing port and a gourmet port and put it into operation within this year.

Ningbo Bay Fuqiao Project: Located in the southwest of Ningbo Bay Tourism Resort, it extends to Tianfei Lake in the north and Xuanshan Island in the south. The total investment of the project is about 120 million yuan, and the construction unit is Ningbo Shiguangwan Scenic Area Development Co., Ltd. It is planned to be completed in October 2021. The total length of the project is 3.05 kilometers, of which the pontoon part is 2.9 kilometers. It adopts polyethylene polymer pontoon structure, and the bridge deck is paved with aluminum alloy keel and solid wood.

Zhejiang Olaer Hydraulics Co., Ltd. high-pressure vessel, accumulator and high-pressure gas cylinder production project: located in Binhai New Area of Fenghua Economic Development Zone, east to Tianhai Road, south to the coastal middle line, west to the planned river, and north to the planned industrial land. The total investment of the project is about 140 million yuan. The construction unit is Zhejiang Olaer Hydraulic Co., Ltd., and the construction period is 2021-2023. The total land area of the project is about 44 mu, and the construction area is about 62,000 square meters. The construction content mainly includes 3 large-scale workshops and 1 office building with basement. It is planned to invest 50 million yuan in 2021 and complete the foundation construction within this year.

Ningbo Hongyue Metal Products Co., Ltd. has an annual output of 20 million sets of kitchenware and bathroom products production project: located in Binhai New Area of Fenghua Economic Development Zone, east and south to the planned industrial land, west to the planned river, and north to Binsha Road. The total investment of the project is about 140 million yuan. The construction unit is Ningbo Hongyue Metal Products Co., Ltd., and the construction period is 2021-2023. The total land area of the project is about 29 mu, and the construction area is about 33,000 square meters. The construction content is a large workshop integrating production and office. It is planned to invest 40 million yuan in 2021 and complete the foundation construction within this year.

Ningbo Hangmai Technology Co., Ltd. has an annual output of 1.2 million sets of electric tools production project: located in Binhai New Area of Fenghua Economic Development Zone, east, south and west to planned industrial land, north to Binsha Road. The total investment of the project is about 70 million yuan. The construction unit is Ningbo Hangmai Technology Co., Ltd., and the construction period is 2021-2023. The total land area of the project is about 20 acres, and the construction area is about 24,000 square meters. The construction content mainly includes 2 large-scale continuous workshops and 1 office building. It is planned to invest 30 million yuan in 2021 and complete the foundation construction within this year.

Ningbo Huige Intelligent Manufacturing Co., Ltd. has an annual output of 1.5 million pieces of smart door lock lock body production project: located in Binhai New Area of Fenghua Economic Development Zone, east to Tianhai Road, south and west to planned industrial land, and north to Binsha Road. The total investment of the project is about 70 million yuan. The construction unit is Ningbo Huige Intelligent Manufacturing Co., Ltd., and the construction period is 2021-2023. The total land area of the project is about 20.7 mu, and the construction area is about 24,000 square meters. The construction content mainly includes 3 large workshops and 1 office building. It is planned to invest 30 million yuan in 2021 and complete the foundation construction within this year.

Fangqiao Resettlement Housing Project: Located in Fangqiao Street, with planned Changpu Road in the north and Huicheng Road in the west. The total investment of the project is 1.36 billion yuan. The construction unit is China Communications City Investment (Ningbo) Co., Ltd., and the construction period is 2021-2023. It is planned to invest 280 million yuan in 2021, and the pile foundation will be constructed during the year. The project is divided into two plots. The investment in the resettlement housing project on the JK05-06-01f plot is about 620 million yuan, the land area is 47.9 mu, the above-ground building area is 77,000 square meters, and the underground building area is 30,000 square meters. The construction content mainly includes 11 high-rise residential buildings and other single-storey supporting ancillary buildings; JK05-06-01n plot resettlement housing project investment is about 740 million yuan, with a land area of 57.4 acres, an above-ground building area of 92,000 square meters, and an underground building area of 37,000 square meters. The construction content mainly includes 11 high-rise residential buildings, a 3-storey kindergarten and other multi-storey supporting ancillary buildings.

Ningnan Trade Logistics Zone Municipal Supporting Improvement Project: Located in Fangqiao Street, the total investment of the project is about 390 million yuan. The construction unit is Ningbo Ningnan Trade Logistics Zone Development Investment Co., Ltd. The construction period is 2021-2023. The project is implemented in two phases. The first phase of construction mainly includes the supporting roads of Kexing, Otisdan, Shenzhen International, and agricultural and sideline products logistics center, Fangyu Road and Fangrui Road rainwater and sewage reconstruction, Jiangfang Road and Hengfang Road streetlight projects, etc. The construction content of the second phase is the reconstruction project of Fangyang North Road. The first phase of the project will be implemented in 2021, with a planned investment of 97 million yuan, and the first phase of the project will be completed within this year.

Kecheng Small and Micro Enterprise Park Project: Located at No. 388, Xiaofeng Road, Xiaowangmiao Street. The total investment of the project is about 200 million yuan. The construction unit is Ningbo Kecheng Energy Technology Co., Ltd., and the construction period is 2021-2022. The land area of the project is about 38.5 mu, and the construction area is about 64,000 square meters. The construction content mainly includes 10 factories and 1 supporting house. It is planned to invest about 40 million yuan in 2021, and the construction of the main structure will be completed within this year.

Ningbo New Energy Automobile Mall Project: Located in Qianheng Village, Jiangkou Street, adjacent to Airport South Road. The total investment of the project is about 200 million yuan. The construction unit is Ningbo Tiantian Nancheng Automobile Service Co., Ltd., and the construction period is 2021-2022. The land area of the project is about 24.4 mu, and the construction area is about 20,000 square meters. The construction content mainly includes functional houses such as headquarters enterprise office, standard automobile 4S shop and automobile integrated service, car club. It is planned to invest 50 million yuan in 2021, and the main construction will be carried out during the year.

Ningbo Feige Intelligent Technology Co., Ltd. has an annual output of 200,000 sets of professional audio equipment and bracket accessories production line project: located in Xiwu Village, Xiwu Street, west to Fenghua Kedi Plastic Gear Co., Ltd., and north to the planned road. The total investment of the project is 60 million yuan. The construction unit is Ningbo Feige Intelligent Technology Co., Ltd., and the construction period is 2021-2022. The project covers an area of about 10 acres and a construction area of about 15,000 square meters. The construction content mainly includes a product research and development center, a production plant, and a comprehensive office building. It is planned to invest 20 million yuan in 2021, and the main body will be completed within this year.

Commercial and residential project of No. 9 plot of Xipu Village: Located in Jinping Street, east to Jinfeng Avenue, south to Comprehensive Commercial City, north to Heguang City Yue. The total investment of the project is about 1.92 billion yuan. The construction unit is Ningbo Baotong Real Estate Co., Ltd., and the construction period is 2021-2024. The total land area of the project is about 75 mu, and the construction area is about 165,000 square meters. The construction content mainly includes 3 high-rise residential buildings with 27 floors, 3 high-rise residential buildings with 22 floors, 6 medium-high-rise residential buildings with 17 floors, and 4 small high-rise residential buildings with 11 floors. It is planned to invest about 400 million yuan in 2021, and the main construction will be carried out during the year.

Old City Reconstruction Project in the Middle Section of Nanshan Road (Tashui Block B3-1): Located in Jinping Street, it is adjacent to Block B3-2 of Tashui Block in the south, to Yuelin Road in the north, Mingshan Road in the west, and Nanshan Road in the east. The total investment of the project is about 1.1 billion yuan. The construction unit is Ningbo Zhujiang Development Investment Co., Ltd., and the construction period is 2021-2023. The total land area of the project is about 35.7 mu, and the construction area is about 94,000 square meters. The construction content mainly includes ordinary residential and commercial blocks. It is planned to invest 300 million yuan in 2021, and the pile foundation will be constructed during the year. Editor/He Yuting

Comment

Related articles

Municipal

G228 Dandong Line Nangu Section Repair and Maintenance Project Commences

10-16

Municipal

EPCC General Contract for 300000 Tons Propane Dehydrogenation to Polypropylene Project

09-25

Municipal

Pakistan's white oil pipeline construction is about to start

09-20

Municipal

Kazakhstan's manufacturing industry surpasses mining industry for the first time

09-12

Municipal

Nanchang AMEC GaAs-based LED MOCVD equipment project was signed

09-11

Municipal

From northern Shaanxi to Guanzhong, the 750 kV channel started

09-02

Collect
Comment
Share

Retrieve password

Get verification code
Sure