On June 23, 2021, the Third Construction of China Construction Eighth Engineering Co., Ltd. and Jiangsu Architectural Design and Research Institute won the bid for the second phase of Nanjing Gulou International Hospital. The project is located in the Central Business District of Jiangbei New District, east to Puwu Road, west to the first phase of the project The boundary line extends to Shifo Street in the south and Kangwu Road in the north. The total land area is about 115.6 mu, of which the actual construction land area is about 94.1 mu, and the reserved land area is about 21.5 mu. The total investment of the project is 2 billion yuan, the total construction area is about 170,000 square meters, the above ground construction area is about 115,000 square meters, and the underground construction area is about 55,000 square meters. The main construction of outpatient medical technology building, ward building, teaching building and other related auxiliary facilities Among them, the largest span of the steel structure project is 86.925m, and the largest single building area is 65,000 square meters. The estimated contract price is 1.78 billion yuan.
On June 23, 2021, the G208 Erxi Line Luoyang Ring Road from Yibin District to Yichuan City was awarded the bid for the reconstruction project. The project was constructed in two bid sections. China Metallurgical Road and Bridge Construction won the G208YCSG-1 bid section with an investment of 1.3 billion. Yuan, China Seventeen Metallurgical Group won the bid for the G208YCSG-2 tender, with an investment of 740 million yuan and a total investment of 2 billion yuan.
The reconstruction project from Yibin District to Yichuan City on the G208 Erxi Line Luoyang Ring Road starts at Xuanzang Road, and the route runs south to the east of G55 Erguang Expressway, passing Changying Village and Yangying Village to the east, from Zhigou Village Passing through Hougou Village, crossing the East One Main Canal, passing from the southeast side of Shangtianyuan Village to the southwest, crossing the Dongyi Main Canal again, crossing the G36 Ningluo Expressway, and crossing the Jiaoliu Railway, the route is laid in Yaozhang Village , Northwest of Wangzhai Village, passing through the southern end of Tumen Village, crossing the Yihe River to the west on the north side of Xiabao Village, and ending with G208. The total length of the road in Yichuan County is 23.408 kilometers. The whole line of the project adopts first-class highways and takes into account the urban road construction standards. Editor/Xing Wentao、Design/Xia Changwang
Comment
Write something~