Transportation
Construction of two rail transit lines in Ningbo started simultaneously
Seetao 2021-07-15 16:24
  • The total length of Line 7 is about 39.4km, the whole line is laid in the form of underground lines, with a total of 25 stations
  • The first phase of Line 8 has a total length of 23.14km, and the entire line is laid in the form of underground lines, with 19 stations
Reading this article requires
6 Minute

On the morning of July 15, 2021, the first phase of Ningbo Rail Transit Line 7 and Line 8 will hold a groundbreaking meeting. The first station of Fumin Park Station of Line 7 and the first phase of Hongda Road Station of Line 8 will start construction simultaneously, further speeding up Promote the implementation of the third phase of Ningbo rail transit construction planning project.

Line 7

Line 7 is a north-south urban line, starting from the Dongqian Lake area in the south, passing through the Eastern New City, the Old Bund, Wantou, Zhuangqiao, and Zhenhai New City, and finally arrives at the Yufan Group, sharing the north-south passenger flow of the city. The total length of the line is about 39.4km, and the whole line is laid in the form of underground lines, with 25 stations and one section for one section.

Among them, the Fumin Park Station of Line 7 is located in the Fumin Park plot in the southeast corner of the intersection of Fuming Road and Min'an Road, Yinzhou District. The station is a two-story underground structure with 2 station entrances and 2 crossings. Fumin Park Station is the first site, and the main civil structure is scheduled to be completed in September 2022.

Line 8 Phase I Project

The first phase of Line 8 is a southeast-northwest urban line, passing through the Southern Higher Education Park, Yinzhou Southern Business District, residential areas on both sides of Liyuan Road, Qinglin Bay, and Jiangbei, forming Jiangbei District, Haishu Central District, and Yinzhou The express passenger corridor between the southern new city. The total length of the line is 23.14km. The whole line is laid in the form of underground lines, with 19 stations and one section and one section.

Hongda Road Station is the first stage of the first phase of line 8 project. It is located on the south side of the intersection of Beihuan West Road and Hongda South Road in Jiangbei District, and is laid along the south-north direction of Hongda South Road. The station has a three-story underground structure, and transfers to the existing Line 4, with 2 entrances and exits (1 reserved interface).

It is understood that the first phase of Line 7 and Line 8 as an important part of Ningbo's rail transit network will further optimize the urban spatial structure, enhance the overall radiation function of the line network, and promote Ningbo's transportation, industry, and space. Integrated layout. At the same time, it will also speed up the construction of a modern coastal metropolis and high-quality development to build a prosperous and prosperous first city, which will greatly enhance the urban development level and improve the travel conditions of citizens. Editor/He Yuting

Comment

Related articles

Transportation

Kangxin Expressway Gongbuka Tunnel Exit Breaks 2000 Meter Node

03-18

Transportation

Shandong Jinan Huanggang Road Yellow River Tunnel achieves double layered connection

03-18

Transportation

48.7 billion yuan! Sichuan Nanjiang to Santai Expressway approved

03-18

Transportation

New progress has been made in the construction of Hangzhou Haikou rail transit

03-17

Transportation

China Railway Tunnel Group wins bid for Singapore MRT extension line contract

03-17

Transportation

The Hunan section of the Changgan high-speed railway is expected to open in 2030

03-17

Collect
Comment
Share

Retrieve password

Get verification code
Sure