Transportation
Construction of two rail transit lines in Ningbo started simultaneously
Seetao 2021-07-15 16:24
  • The total length of Line 7 is about 39.4km, the whole line is laid in the form of underground lines, with a total of 25 stations
  • The first phase of Line 8 has a total length of 23.14km, and the entire line is laid in the form of underground lines, with 19 stations
Reading this article requires
6 Minute

On the morning of July 15, 2021, the first phase of Ningbo Rail Transit Line 7 and Line 8 will hold a groundbreaking meeting. The first station of Fumin Park Station of Line 7 and the first phase of Hongda Road Station of Line 8 will start construction simultaneously, further speeding up Promote the implementation of the third phase of Ningbo rail transit construction planning project.

Line 7

Line 7 is a north-south urban line, starting from the Dongqian Lake area in the south, passing through the Eastern New City, the Old Bund, Wantou, Zhuangqiao, and Zhenhai New City, and finally arrives at the Yufan Group, sharing the north-south passenger flow of the city. The total length of the line is about 39.4km, and the whole line is laid in the form of underground lines, with 25 stations and one section for one section.

Among them, the Fumin Park Station of Line 7 is located in the Fumin Park plot in the southeast corner of the intersection of Fuming Road and Min'an Road, Yinzhou District. The station is a two-story underground structure with 2 station entrances and 2 crossings. Fumin Park Station is the first site, and the main civil structure is scheduled to be completed in September 2022.

Line 8 Phase I Project

The first phase of Line 8 is a southeast-northwest urban line, passing through the Southern Higher Education Park, Yinzhou Southern Business District, residential areas on both sides of Liyuan Road, Qinglin Bay, and Jiangbei, forming Jiangbei District, Haishu Central District, and Yinzhou The express passenger corridor between the southern new city. The total length of the line is 23.14km. The whole line is laid in the form of underground lines, with 19 stations and one section and one section.

Hongda Road Station is the first stage of the first phase of line 8 project. It is located on the south side of the intersection of Beihuan West Road and Hongda South Road in Jiangbei District, and is laid along the south-north direction of Hongda South Road. The station has a three-story underground structure, and transfers to the existing Line 4, with 2 entrances and exits (1 reserved interface).

It is understood that the first phase of Line 7 and Line 8 as an important part of Ningbo's rail transit network will further optimize the urban spatial structure, enhance the overall radiation function of the line network, and promote Ningbo's transportation, industry, and space. Integrated layout. At the same time, it will also speed up the construction of a modern coastal metropolis and high-quality development to build a prosperous and prosperous first city, which will greatly enhance the urban development level and improve the travel conditions of citizens. Editor/He Yuting

Comment

Related articles

Transportation

Dongjiakou Wulian Railway and Jiaoxin Railway Capacity Expansion and Renovation Project

12-05

Transportation

Morocco plans to start construction of Tangier Tetouan Expressway in 2027

12-04

Transportation

The planning of Pilar Kano Bridge has entered the substantive stage

12-04

Transportation

Approval of feasibility study for Yongqing Guangzhou Railway within the year is expected

12-04

Transportation

Miansui Inner Railway ran at Sichuan speed in the second half

12-03

Transportation

Guangzhou's new airport invests 50 billion yuan to fill the gap of Zhuxi Airlines

12-03

Collect
Comment
Share

Retrieve password

Get verification code
Sure