Recently, the feasibility study report of the first phase of Foshan Urban Rail Transit Line 4 was officially approved by the Guangdong Provincial Development and Reform Commission.
The first phase of Foshan Urban Rail Transit Line 4 starts from Beijiang Avenue Station in the west and ends at Gangkou Road Station in the east. The total length of the line is 55.21 kilometers, including 49.13 kilometers underground section, 5.17 kilometers elevated section, and 0.91 kilometers transition section. There are 33 stations (including 30 underground stations and 3 elevated stations). The project uses 6 B-type vehicles in a marshalling, with a maximum operating speed of 100 km/h. The project investment is estimated at 44.601 billion yuan. The project owner is Foshan Railway Investment and Construction Group Co., Ltd., responsible for project investment, construction and management.
Keywords: engineering construction, engineering news
The first phase of Foshan Urban Rail Transit Line 4 is the east-west backbone of Foshan City, which connects Sanshui, Nanhai and Chancheng, and mainly radiates the southwest group of Sanshui, Shishan city sub-center, Foshan West Railway Station high-speed rail hub, and Jihua The city’s key development areas such as the central area of Lucheng City and Sanlong Bay High-end Innovation Cluster are of great significance to improving the overall service level of the city’s rail transit network.Editor/Xing Wentao、Design/Xia Changwang
Comment
Write something~