New Energy
Huaneng North Shangdu Million-kilowatt Wind Power Base Project
Seetao 2021-07-26 10:10
  • The construction of the Huaneng North Shangdu million-kilowatt wind power base project will optimize local power facilities
Reading this article requires
4 Minute

With the increasing progress of the new energy industry, major companies are actively assisting the construction of new energy industry facilities. Recently, Shandong Yijian New Energy Market Development has made new achievements and successfully won the bid for the 6th bid section of the wind farm construction project of the northern Shangdu million kilowatt wind power base project.

The Huaneng Northern Shangdu million-kilowatt wind power base project is located in Zhenglan Banner and Duolun County, Xilin Gol League, Inner Mongolia Autonomous Region. The planned installed capacity of the project is 1600MW. The Duolun 2 wind farm won the bid this time. The main construction tasks include 150MW wind turbine equipment foundation. Civil construction, equipment installation, road construction and maintenance in the wind farm, civil construction and installation of wind turbine transformers, laying of collector cables, installation of 35kV collector lines, etc.

Keywords: engineering news, energy projects

The bid for this project is another development after the company won the bid for Bayannaoer 400MW wind power EPC, Datang Baishui 99MW photovoltaic EPC, Huaneng Tongyu 2 million kilowatt wind power project, Datang Xiangyang Wind Farm Phase II 600MW project, and Gansu Huadian 200MW wind power EPC. Fruitful. Shandong Yijian actively contributes to the national "carbon peak and carbon neutral" strategy, gives full play to the advantages of new energy project construction management, promotes the realization of high standards and high-level contract performance, strives to create high-quality projects, and contributes to the development of clean energy.Editor/Xing Wentao

Comment

Related articles

Energy storage

Yiwei Lithium Energy 40GWh battery project ushered in significant progress

04-28

Hydrogen energy

Inteli 5GW hydrogen production phase II project started

04-28

Hydropower

Xinjiang pumped storage project feasibility study report review meeting held

04-28

Wind power

CSSC offshore installation of 139 units standing Tongliao wind power base

04-28

New Energy

China Energy Group signed contract for 2×350MW cogeneration project

04-28

Wind power

Qinghai Haixi 2GW wind power project started

04-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure