Construction Frontline
New start! New contract with China Harbour Indonesia
Seetao 2021-01-14 11:48
  • The main work content of the project includes a dedicated dock for bulk carriers and a shipping trestle
Reading this article requires
3 Minute

The start is the war, and the start is the climax. On January 7, 2021, China Harbor signed a contract for the 180,000-ton bulk carrier special terminal project in La Bota Port Area, Qingshan Industrial Park, Indonesia, with a construction period of 10 months. The owner is the Qingshan Park Development Co., Ltd. of the Indonesian Economic and Trade Cooperation Zone.

The project is located in Central Sulawesi Province, Sulawesi Island, Indonesia. The main work content of the project includes a dedicated 180,000-ton bulk carrier wharf (including 2 approach bridges and 1 trestle bridge) and a heavy cargo wharf emergency trestle.

The project is a supporting port for Indonesia's largest ferronickel industrial park (Qingshan Ferronickel Park). The signing of the project further deepens the cooperation relationship between the company and the owner, and is conducive to consolidating the company's market position in the Indonesian national maritime engineering field. Editor/Sang Xiaomei

Comment

Related articles

Construction Frontline

1.2 billion US dollars reinvested in Tanzania Zambia Railway

04-04

Construction Frontline

2200 tons! The largest gantry crane in CSSC history has officially started construction

04-03

Construction Frontline

China invests $1.2 billion to build steel plant in Kazakhstan

04-03

Construction Frontline

Wu Qiqi visits China Electric Power Construction again! Zemun Railway Speed Up

04-02

Construction Frontline

Gezhouba Group wins EPC contract for Indonesia's Poyiga 2 hydropower station

04-01

Construction Frontline

Nepal's Prime Minister takes office, China India cross-border railway double tracks merge

04-01

Collect
Comment
Share

Retrieve password

Get verification code
Sure