Municipal
China Railway Construction won 7.1 billion large orders!
Seetao 2021-04-18 09:57
  • This project will fully integrate resources, accelerate the overall revitalization of rural areas, and build Lingang New City
Reading this article requires
5 Minute

On April 17, 2021, it was learned from the Jiangsu Public Resources Trading Center that the candidate for the development of Chenjiagang Gangcheng in Yancheng City was announced. China Railway 12th Bureau Group Co., Ltd. won the 7.1 billion bid!

Introduction to the Hong Kong City Development Project

The total area of the cooperation area of the Chenjiagang Port City Development Project in Yancheng is 1189.81 hectares, including 58.98 hectares in the Haijing Salt Factory area, 147.05 hectares in the Jinghu Park area, 89.26 hectares in the Ludao area, urban infrastructure construction in Chenjiagang Port City, and Dongsheng Salt Plant The area is 66.04 hectares and the Sanwei work area 828.48 hectares (including the Zhongbawei, Dongbawei, Zhongqiwei, Dongqiwei, Zhongliuwei, and Dongliuwei salt fields in the Sanwei work zone). The construction content and scale are divided into two groups, A and B. Among them, the construction content of Group A is Haijing Salt Factory area, Jinghu Park area, Green Island area, and urban infrastructure; the construction content of Group B is Dongsheng Salt Field Area and Sanwei Industrial Area. The final construction content is subject to the approval document.

The estimated price of the contract is estimated to be 7,126.5287 million yuan based on the project record registration, and mainly includes the investment and construction content of Group A and Group B. The total investment in Group A construction is 535.9521 million yuan, and the total investment in Group B construction is 177,557,600 yuan, of which the construction cost is 5,318,652,300 yuan, and the other construction engineering costs are 1,110,451,600 yuan (including the preliminary expenses (expropriation and demolition and land leveling) 47,821,330 yuan). The preparatory expenses are 372,305,700 yuan, and the loan interest during the construction period is 319,119,100 yuan.

This project will fully integrate various element resources, coordinate the implementation of Chenjiagang's planning and construction work, focus on promoting the high-quality development of Chenjiagang Town, accelerate the realization of the comprehensive revitalization of the village, and build the Lingang New City. Editor/Sang Xiaomei

Comment

Related articles

Municipal

Over 2.24 billion yuan! Two key engineering projects in Fujian have successfully won bids

03-16

Municipal

The dust of Chongqing's 20 billion yuan project has settled!

02-24

Municipal

The fourth generation residential project in Huahu, Ezhou has started construction

02-08

Municipal

Gansu Guanshan Scenic Area Cultural and Tourism Project EPC Bid Opening

12-29

Municipal

25800 pieces! Exceeding the deadline for the renovation of old residential areas in 2025

12-26

Municipal

Gezhouba Ankang 6.9 billion yuan ecological governance big deal

12-18

Collect
Comment
Share

Retrieve password

Get verification code
Sure