[The Canal, China's super-large-diameter shield machine, is put into use]The "Canal", a mud-water balance shield machine with the largest diameter domestically developed, designed and manufactured by China, was put into use in the Beijing East Sixth Ring Road Transformation Project recently. The "Canal", a super large-diameter shield machine tailored for the reconstruction of the East Sixth Ring Road, consists of a cutter head, a shield body and 5 sets of trolleys, with a total weight of about 4,500 tons. Editor/Xu Shengpeng
On October 11, 2026, the Gaosheng No.2 Tunnel of the West Chongqing High speed Railway, constructed by CRSG, was successfully completed in Kaizhou District, Chongqing. The tunnel has a total length of 7234 meters and is classified as a Class I high-risk tunnel, overcoming multiple geological challenges. The project has laid the foundation for the timely opening of the West Chongqing high-speed railway, improved the high-speed railway network in the central and western regions, and driven regional coordinated development. Editor/Min Jing
On October 10, 2026, the Yanwei 1000 kV High Voltage Project was completed and put into operation, which is also the first ultra-high voltage AC transmission and transformation project put into operation during China's 15th Five Year Plan period. The total length of the project line is 1197 kilometers. After it is put into operation, nuclear power from Haiyang, Laiyang and other places in Yantai, Shandong will be sent out through this channel, greatly improving the green power supply capacity in Shandong Province. Editor/Min Jing