[$519.3 million! Brazil launches two new railway projects] Brazilian President Jair Bolsonaro and Infrastructure Minister Tarcísio de Freitas will attend the groundbreaking ceremony on September 17 to commemorate the north-south railway from Mara Rosa to Água Boa. Editor/Bao Hongying
Click to see more live >>
Latest
  • 2026.07.03 10:15
  • [The Hami solar thermal project in Xinjiang is connected to the grid]
  • On July 1, 2026, China Energy Engineering Corporation's "Wind and Solar Same Field" 400 MW project in Hami, Xinjiang was fully connected to the grid. Annual power generation exceeds 900 million kilowatt hours, marking its first project of its kind to be put into operation.Editor/Gao Xue
Share

Retrieve password

Get verification code
Sure