[The winning bid for Changshui Airport to Shuanglong Expressway is released]A few days ago, the social investors of the concession project from Changshui Airport to Shuanglong Expressway announced that the candidates won the bid. Xinjiang Beixin Road and Bridge Group Co., Ltd. and the Xinjian Hongman Fund Management (Beijing) Co., Ltd. consortium won the bid. The project approved the preliminary design estimate and the total investment It is 3.266 billion yuan. Editor/Sang Xiaomei
On October 16, 2026, the first unit of the CGN Tuanfeng Weijiachong Pumped Storage Power Station was put into commercial operation, which is the first small and medium-sized pumped storage project to be put into operation during China's 15th Five Year Plan period. As the first small and medium-sized pumped storage power station in China to adopt a "runway type" semi underground factory building, this project has built the deepest semi underground factory building shaft in China, which will strongly support the construction of the Hubei Province source grid load storage collaborative interactive power system.Editor/Cheng Liting
On October 15, 2026, the largest comprehensive test platform for electric driven double trailer large compressors in China, built by Dongfang Electric, was completed and put into operation. This platform focuses on three core functions: basic research, prototype verification, and factory inspection. It can conduct aerodynamic performance tests at all levels of axial flow and centrifugal compressors, build blade and element level databases, and provide data support for unit design. Editor/Cheng Liting