[Liaoning Petroleum September 18th Gas Station Unveiled]On September 18, on the occasion of commemorating the 90th anniversary of the "September 18th" Incident, the Liaoning Petroleum Red Theme Gas Station-the "September 18th" Gas Station was inaugurated. Editor/Sang Xiaomei
Guangzhou Metro and two Vietnamese companies have won the feasibility study and design consulting contract for the first phase of Ho Chi Minh City Metro Line 6, with an amount equivalent to 11.98 million US dollars. This is the third subway project they have won locally. The consortium will take 270 days to complete the preliminary core work such as line planning and TOD development research.Editor/Min Jing
The national railway procurement platform has released a pre qualification announcement for the first phase of the China Thailand high-speed railway in Bangkok's Nakhon Ratchasima section, covering the entire track, power supply and communication signal construction in four sections. The bidding qualification thresholds for each section have been clarified, and the project has bid farewell to civil construction and entered a critical stage of track equipment installation.Editor/Min Jing