[Cooperation between Shanghai Petrochemical and Zhejiang Pinghu] On the afternoon of September 16, Shanghai Petrochemical and the Management Committee of Zhejiang Dushan Port Economic Development Zone signed a contract on the joint construction of the Pinghu-Shanghai Petrochemical New Material Industrial Park. Editor/Sang Xiaomei
Click to see more live >>
Latest
  • 2026.08.07 15:53
  • [Shanxi's wind and solar power installed capacity exceeds 80 million kilowatts]
  • As of the end of June 2026, the installed capacity of wind and solar new energy power generation in Shanxi Province has exceeded 80 million kilowatts, reaching 80.6121 million kilowatts. During the 14th Five Year Plan period, the province added 45.0091 million kilowatts of wind and solar new energy power generation installed capacity, an increase of 137.11% compared to the end of the 13th Five Year Plan.Editor/Cheng Liting
Share

Retrieve password

Get verification code
Sure